"A genetic algorithm-based method for look-ahead scheduling in the ..."
Ning Dong et al. (2012)
- Ning Dong, Dongdong Ge, Martin Fischer, Zuhair Haddad:
A genetic algorithm-based method for look-ahead scheduling in the finishing phase of construction projects. Adv. Eng. Informatics 26(4): 737-748 (2012)