| 2013 | ||
|---|---|---|
| j14 | M. T. Yazdani Sabouni, Rasaratnam Logendran: A single machine carryover sequence-dependent group scheduling in PCB manufacturing. Computers & OR 40(1): 236-247 (2013) | |
| j13 | M. T. Yazdani Sabouni, Rasaratnam Logendran: Carryover sequence-dependent group scheduling with the integration of internal and external setup times. European Journal of Operational Research 224(1): 8-22 (2013) | |
| j12 | Dongchen Lu, Rasaratnam Logendran: Bi-criteria group scheduling with sequence-dependent setup time in a flow shop. JORS 64(4): 530-546 (2013) | |
| 2012 | ||
| j11 | Mir Abbas Bozorgirad, Rasaratnam Logendran: Sequence-dependent group scheduling problem on unrelated-parallel machines. Expert Syst. Appl. 39(10): 9021-9030 (2012) | |
| j10 | Dongchen Lu, Rasaratnam Logendran: Scheduling jobs in flowshops with the introduction of additional machines in the future. Expert Syst. Appl. 39(12): 11219-11227 (2012) | |
| 2010 | ||
| j9 | Nasser Salmasi, Rasaratnam Logendran, Mohammad Reza Skandari: Total flow time minimization in a flowshop sequence-dependent group scheduling problem. Computers & OR 37(1): 199-212 (2010) | |
| j8 | Cumhur A. Gelogullari, Rasaratnam Logendran: Group-scheduling problems in electronics manufacturing. J. Scheduling 13(2): 177-202 (2010) | |
| 2007 | ||
| j7 | Rasaratnam Logendran, Brent McDonell, Byran Smucker: Scheduling unrelated parallel machines with sequence-dependent setups. Computers & OR 34(11): 3420-3438 (2007) | |
| j6 | Shakib Shakeri, Rasaratnam Logendran: A mathematical programming-based scheduling framework for multitasking environments. European Journal of Operational Research 176(1): 193-209 (2007) | |
| 2006 | ||
| j5 | Rasaratnam Logendran, Nasser Salmasi, Chelliah Sriskandarajah: Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups. Computers & OR 33: 158-180 (2006) | |
| 1997 | ||
| j4 | Rasaratnam Logendran, Parthasarathi Ramakrishna: A methodology for simultaneously dealing with machine duplication and part subcontracting in cellular manufacturing systems. Computers & OR 24(2): 97-116 (1997) | |
| 1995 | ||
| j3 | Sang-jin Nam, Rasaratnam Logendran: Modified production switching heuristics for aggregate production planning. Computers & OR 22(5): 531-541 (1995) | |
| 1988 | ||
| j2 | Rasaratnam Logendran, M. Palmer Terrell: Uncapacitated plant location-allocation problems with price sensitive stochastic demands. Computers & OR 15(2): 189-198 (1988) | |
| 1986 | ||
| j1 | C. Patrick Koelling, Rasaratnam Logendran: Waste-water treatment: Design and optimization using nonlinear search techniques. Computers & OR 13(1): 69-84 (1986) | |
Colors in the list of coauthors
Last update Tue May 21 05:41:21 2013 CET by the DBLP Team —
Data released under the ODC-BY 1.0 license — See also our legal information page