Daizhong Su, Nariman Amin: A CGI-based approach for remotely executing a large program for integration of design and manufacture over the Internet.
55-65
B. Iung, E. Neunreuther, Gérard Morel: Engineering process of integrated - distributed shop floor architecture based on interoperable field components.
246-262
Z. Katz, S. A. Theron: Improvement of robotic cell intelligence through a dedicated recognition system.
263-269
Huaglory Tianfield: Advanced life-cycle model for complex product development via stage-aligned information-substitutive concurrency and detour.
281-303
Bin Wu: Strategy analysis and system design within an overall framework of manufacturing system management.
319-341
Volume 14, Number 4, 2001
Nguyen Van Hop, M. T. Tabucanon: Set-up problem for a line of machines in PCB assembly process planning: a multiple criteria decision making approach.
343-352
Ronald E. McGaughey, David W. Roach: CIM planning: an exploratory study of factors practitioners perceive important to CIM planning success.
353-366
Ping-Teng Chang, Yu-Ting Lo: Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach.
367-384
Jong Gye Shin, Sug Je Sohn: Evolutionary Simulation-Based-Design (ESBD) methodology for large computer integrated manufacturing systems.
385-398
M. K. Tiwari, M. Chandrasekaran, R. P. Mohanty: Use of timed petri net and activity cycle diagram methodologies for modelling tandem AGVs in FMSs and their performance evaluation.
399-408
Jean-Luc Paris, Henri Pierreval: A distributed evolutionary simulation optimization approach for the configuration of multiproduct kanban systems.
421-430
Felix T. S. Chan: The effects of routing flexibility on a flexible manufacturing system.
431-445
Pooja Dewan, Sanjay Joshi: Implementation of an auction-based distributed scheduling model for a dynamic job shop environment.
446-456