Jirachai Buddhakulsomsiri, David S. Kim: Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting.
374-390
Bernd Wagner: An exact solution procedure for a cluster hub location problem.
391-401
Jean-Pierre Kenné, Anis Gharbi, M. Beit: Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale.
408-420
Xiangtong Qi: Order splitting with multiple capacitated suppliers.
421-432
I. Konstantaras, Sotirios Papachristos: Optimal policy and holding cost stability regions in a periodic review inventory system with manufacturing and remanufacturing options.
433-448
Doo Il Choi, Tae-Sung Kim, Sangmin Lee: Analysis of a queueing system with a general service scheduling function, with applications to telecommunication network traffic control.
463-471
Chun-hyun Paik, Samit Soni: A simulated annealing based solution approach for the two-layered location registration and paging areas partitioning problem in cellular mobile networks.
579-594
Interfaces with Other Disciplines
Ephraim Clark, Joshy Z. Easaw: Optimal access pricing for natural monopoly networks when costs are sunk and revenues are uncertain.
595-602
Sanjay Sharma: A fresh approach to performance evaluation in a multi-item production scenario.
627-630
J. J. Yuan, T. C. Edwin Cheng, C. T. Ng: NP-hardness of the single-variable-resource scheduling problem to minimize the total weighted completion time.
631-633
Chung-Yuan Dye, Liang-Yuh Ouyang, Tsu-Pang Hsieh: Deterministic inventory model for deteriorating items with capacity constraint and time-proportional backlogging rate.
789-807