 | 2009 |
| 4 |  | K. Rezaie,
A. Gereie,
B. Ostadi,
M. Shakhseniaee:
Safety interval analysis: A risk-based approach to specify low-risk quantities of uncertainties for contractor's bid proposals.
Computers & Industrial Engineering 56(1): 152-156 (2009) |
| 2007 |
| 3 |  | K. Rezaie,
B. Ostadi:
A mathematical model for optimal and phased implementation of flexible manufacturing systems.
Applied Mathematics and Computation 184(2): 729-736 (2007) |
| 2 |  | B. Ostadi,
D. Moazzami,
K. Rezaie:
A non-linear programming model for optimization of the electrical energy consumption in typical factory.
Applied Mathematics and Computation 187(2): 944-950 (2007) |
| 1 |  | K. Rezaie,
Mohsen Sadegh Amalnik,
A. Gereie,
B. Ostadi,
M. Shakhseniaee:
Using extended Monte Carlo simulation method for the improvement of risk management: Consideration of relationships between uncertainties.
Applied Mathematics and Computation 190(2): 1492-1501 (2007) |