 | 2012 |
| 9 |  | Rabia Nessah,
Imed Kacem:
Branch-and-bound method for minimizing the weighted completion time scheduling problem on a single machine with release dates.
Computers & OR 39(3): 471-478 (2012) |
| 2010 |
| 8 |  | Rabia Nessah,
Chengbin Chu:
Infinite split scheduling: a new lower bound of total weighted completion time on parallel machines with job release dates and unavailability periods.
Annals OR 181(1): 359-375 (2010) |
| 7 |  | Rabia Nessah,
Chengbin Chu:
A lower bound for weighted completion time variance.
European Journal of Operational Research 207(3): 1221-1226 (2010) |
| 2008 |
| 6 |  | Rabia Nessah,
Farouk Yalaoui,
Chengbin Chu:
A branch-and-bound algorithm to minimize total weighted completion time on identical parallel machines with job release dates.
Computers & OR 35(4): 1176-1190 (2008) |
| 5 |  | Moussa Larbani,
Rabia Nessah:
A note on the existence of Berge and Berge-Nash equilibria.
Mathematical Social Sciences 55(2): 258-271 (2008) |
| 2007 |
| 4 |  | Rabia Nessah,
Moussa Larbani,
Tarik Tazdait:
A note on Berge equilibrium.
Appl. Math. Lett. 20(8): 926-932 (2007) |
| 3 |  | Rabia Nessah,
Chengbin Chu,
Farouk Yalaoui:
An exact method for Pm/sds, ri/sum(i=1, n, Ci) problem.
Computers & OR 34(9): 2840-2848 (2007) |
| 2005 |
| 2 |  | Rabia Nessah,
Moussa Larbani:
Generalized g-quasivariational inequality.
Int. J. Math. Mathematical Sciences 2005(21): 3373-3385 (2005) |
| 2001 |
| 1 |  | Moussa Larbani,
Rabia Nessah:
Sur l'équilibre fort selon Berge.
RAIRO - Operations Research 35(4): 439-451 (2001) |