 | 2011 |
| 12 |  | Orides Morandin Jr.,
Vicius Fernandes Carida,
Edilson Reis Rodrigues Kato,
Marcos Abraão de Souza Fonseca:
A hierarchical fuzzy rule-based building model applied to a AGV dispatching system in an FMS.
ICRA 2011: 3764-3769 |
| 2010 |
| 11 |  | Edilson R. R. Kato,
Orides Morandin Jr.,
Marcos Abraão de Souza Fonseca:
A Max-Min Ant System modeling approach for production scheduling in a FMS.
SMC 2010: 3977-3982 |
| 10 |  | Edilson R. R. Kato,
Orides Morandin Jr.,
Mayra Sgavioli:
A conflict solution manufacturing system modeling using Fuzzy Coloured Petri net.
SMC 2010: 3983-3988 |
| 2009 |
| 9 |  | Edilson R. R. Kato,
Orides Morandin Jr.,
Mayra Sgavioli,
Bruno Drugowick Muniz:
Genetic Tuning for Improving Wang and Mendel's Fuzzy Database.
SMC 2009: 1015-1020 |
| 8 |  | Edilson R. R. Kato,
Orides Morandin Jr.,
Marcos Abraão de Souza Fonseca:
Ant Colony Optimization Algorithm for Reactive Production Scheduling Problem in the Job Shop System.
SMC 2009: 2199-2204 |
| 7 |  | Orides Morandin Jr.,
Edilson R. R. Kato,
Danilo Sipoli Sanches,
Bruno Drugowick Muniz:
Modeling Strategy by Adaptive Genetic Algorithm for Production Reactive Scheduling with Simultaneous use of Machines and AGVs.
SMC 2009: 704-709 |
| 2008 |
| 6 |  | Danilo Sipoli Sanches,
Orides Morandin Jr.,
Bruno Drugowick Muniz,
Edilson R. R. Kato:
Modeling Strategy by Adaptive Genetic Algorithm for Production Reactive Scheduling with Simultaneous Use of Machines and AGVs.
CIMCA/IAWTIC/ISE 2008: 249-254 |
| 5 |  | Orides Morandin Jr.,
Edilson Reis Rodrigues Kato,
Ageu Morais Duarte,
Allan Rodrigues Silva:
A Fuzzy Classifier Model for the Production Sequencing.
CIMCA/IAWTIC/ISE 2008: 597-602 |
| 4 |  | Orides Morandin Jr.,
Edilson R. R. Kato,
Flavio A. Montoro,
Veronica Oliveira de Carvalho:
A Production Sequencing Model for a Decision Support System.
CIMCA/IAWTIC/ISE 2008: 814-819 |
| 2007 |
| 3 |  | Orides Morandin Jr.,
Edilson R. R. Kato,
G. Rodrigo Araújo,
V. Luciano Sasso:
A modeling strategy for control and interlocking of an AMS using Virtual Petri Nets.
SMC 2007: 3493-3498 |
| 2005 |
| 2 |  | Orides Morandin Jr.,
Edilson R. R. Kato:
Virtual Petri nets as a modular modeling method for planning and control tasks of FMS.
Int. J. Computer Integrated Manufacturing 18(2&3): 100-106 (2005) |
| 2004 |
| 1 |  | Pablo Alberto Dalbem de Castro,
Matheus Giovanni Pires,
Heloisa de Arruda Camargo,
Orides Morandin Jr.,
Edilson R. R. Kato:
Genetic learning of fuzzy rules applied to sequencing problem of FMS.
SMC (5) 2004: 4336-4341 |