 | 2011 |
| 11 |  | P. P. Wang,
X. G. Ming,
D. Li,
F. B. Kong,
L. Wang,
Z. Y. Wu:
Modular Development of Product Service Systems.
Concurrent Engineering: R&A 19(1): 85-96 (2011) |
| 2010 |
| 10 |  | Quan Zhang,
X. G. Ming,
Changde Lu:
Reliability evaluation of conceptual colour design based on rough sets.
IJCAT 37(3/4): 204-209 (2010) |
| 9 |  | X. H. Wang,
L. W. Fu,
X. G. Ming,
F. B. Kong,
D. Li:
Supplier-involved collaborative product development in PLM.
IJCAT 37(3/4): 244-256 (2010) |
| 8 |  | Yi Lin,
X. G. Ming:
Multi-level contextual product development knowledge management in PLM.
IJCAT 37(3/4): 279-286 (2010) |
| 7 |  | Rong Wang,
Jian-Hua Ji,
X. G. Ming:
R&D partnership contract coordination of information goods supply chain in government subsidy.
IJCAT 37(3/4): 297-306 (2010) |
| 2009 |
| 6 |  | F. B. Kong,
X. G. Ming,
L. Wang,
X. H. Wang,
P. P. Wang:
On Modular Products Development.
Concurrent Engineering: R&A 17(4): 291-300 (2009) |
| 2008 |
| 5 |  | X. G. Ming,
J. Q. Yan,
X. H. Wang,
S. N. Li,
W. F. Lu,
Q. J. Peng,
Y. S. Ma:
Collaborative process planning and manufacturing in product lifecycle management.
Computers in Industry 59(2-3): 154-166 (2008) |
| 4 |  | X. H. Wang,
X. G. Ming,
F. B. Kong,
L. Wang,
C. L. Zhao:
Collaborative Project Management with Supplier Involvement.
Concurrent Engineering: R&A 16(4): 253-261 (2008) |
| 3 |  | X. G. Ming,
J. Q. Yan,
X. H. Wang,
W. F. Lu,
Q. J. Peng:
Collaborative manufacturing process planning for distributed integration in tooling industry.
IJMTM 14(1/2): 17-34 (2008) |
| 2007 |
| 2 |  | X. H. Wang,
X. G. Ming,
J. Q. Yan,
W. F. Lu,
Q. J. Peng:
Collaborative design and manufacturing process planning in tooling industry.
IJCAT 30(3): 221-234 (2007) |
| 2005 |
| 1 |  | X. G. Ming,
J. Q. Yan,
W. F. Lu,
D. Z. Ma:
Technology Solutions for Collaborative Product Lifecycle Management - Status Review and Future Trend.
Concurrent Engineering: R&A 13(4): 311-319 (2005) |