 | 2011 |
| 20 |  | Lars Mönch,
John W. Fowler,
Stéphane Dauzère-Pérès,
Scott J. Mason,
Oliver Rose:
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations.
J. Scheduling 14(6): 583-599 (2011) |
| 19 |  | Lars Mönch,
Jens Zimmermann,
Scott J. Mason,
John W. Fowler:
Multiple orders per job formation and release strategies in large-scale wafer fabs: a simulation study.
J. Simulation 5(1): 25-43 (2011) |
| 2010 |
| 18 |  | Jagadish Jampani,
Scott J. Mason:
A column generation heuristic for complex job shop multiple orders per job scheduling.
Computers & Industrial Engineering 58(1): 108-118 (2010) |
| 17 |  | Yasin Unlu,
Scott J. Mason:
Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems.
Computers & Industrial Engineering 58(4): 785-800 (2010) |
| 16 |  | Scott J. Mason,
Jen-Shiang Chen:
Scheduling multiple orders per job in a single machine to minimize total completion time.
European Journal of Operational Research 207(1): 70-77 (2010) |
| 15 |  | Jagadish Jampani,
Edward A. Pohl,
Scott J. Mason,
Lars Mönch:
Integrated heuristics for scheduling multiple order jobs in a complex job shop.
IJMHeur 1(2): 156-180 (2010) |
| 2009 |
| 14 |  | Brittany M. Bogle,
Scott J. Mason:
Optimizing Demand Fulfillment from Test Bins.
Winter Simulation Conference 2009: 1730-1736 |
| 2008 |
| 13 |  | Scott J. Mason,
Raymond R. Hill,
Lars Mönch,
Oliver Rose,
Thomas Jefferson,
John W. Fowler:
Proceedings of the 2008 Winter Simulation Conference, Global Gateway to Discovery, WSC 2008, InterContinental Hotel, Miami, Florida, USA, December 7-10, 2008
WSC 2008 |
| 12 |  | Jens Zimmermann,
Scott J. Mason,
John W. Fowler,
Lars Mönch:
Determining an appropriate number of FOUPs in semiconductor wafer fabrication facilities.
Winter Simulation Conference 2008: 2164-2170 |
| 11 |  | Vishnu Erramilli,
Scott J. Mason:
Multiple orders per job batch scheduling with incompatible jobs.
Annals OR 159(1): 245-260 (2008) |
| 10 |  | Jagadish Jampani,
Scott J. Mason:
Column generation heuristics for multiple machine, multiple orders per job scheduling problems.
Annals OR 159(1): 261-273 (2008) |
| 9 |  | Michele E. Pfund,
Hari Balasubramanian,
John W. Fowler,
Scott J. Mason,
Oliver Rose:
A multi-criteria approach for scheduling semiconductor wafer fabrication facilities.
J. Scheduling 11(1): 29-47 (2008) |
| 2007 |
| 8 |  | Rajesh Swaminathan,
Michele E. Pfund,
John W. Fowler,
Scott J. Mason,
Ahmet B. Keha:
Impact of permutation enforcement when minimizing total weighted tardiness in dynamic flowshops with uncertain processing times.
Computers & OR 34(10): 3055-3068 (2007) |
| 2005 |
| 7 |  | Ghazi M. Magableh,
Manuel D. Rossetti,
Scott J. Mason:
Modeling and analysis of a generic cross-docking facility.
Winter Simulation Conference 2005: 1613-1620 |
| 2004 |
| 6 |  | Joshua Burton McGee,
Manuel D. Rossetti,
Scott J. Mason:
Simulating Transportation Practices in Multi-Indenture Multi-echelon (MIME) Systems.
Winter Simulation Conference 2004: 974-981 |
| 2002 |
| 5 |  | Juergen Potoradi,
Ong Siong Boon,
Scott J. Mason,
John W. Fowler,
Michele E. Pfund:
Semiconductor manufacturing: using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility.
Winter Simulation Conference 2002: 1857-1861 |
| 2001 |
| 4 |  | Peng Qu,
Geoffrey E. Skinner,
Scott J. Mason:
Sizing a pilot production line using simulation.
Winter Simulation Conference 2001: 1188-1193 |
| 3 |  | Kasin Oey,
Scott J. Mason:
Scheduling and dispatching: scheduling batch processing machines in complex job shops.
Winter Simulation Conference 2001: 1200-1207 |
| 2000 |
| 2 |  | Scott J. Mason,
John W. Fowler:
Semiconductor manufacturing scheduling: maximizing delivery performance in semiconductor wafer fabrication facilities.
Winter Simulation Conference 2000: 1458-1463 |
| 1996 |
| 1 |  | Scott J. Mason,
Paul A. Jensen,
John W. Fowler:
A Comparison Study of the Logic of Four Wafer Fabrication Simulators.
Winter Simulation Conference 1996: 1031-1038 |