![]() | ![]() |
| 2000 | ||
|---|---|---|
| 2 | G. Kostaras, I. Makarouni, G. Mitrou, John E. Psarras: Solving Large Scale Multi-Criteria Job Sequencing Problems in Real Industrial Environments. ICEIS 2000: 157-162 | |
| 1999 | ||
| 1 | John E. Psarras, G. Mitrou, I. Makarouni, Dimitris Askounis: Optimizing a Real-World Scheduling Problem in the Steel Industry. ICEIS 1999: 767 | |
| 1 | Dimitris Askounis | [1] |
| 2 | G. Kostaras | [2] |
| 3 | G. Mitrou | [1] [2] |
| 4 | John E. Psarras (Ioannis Psarras) | [1] [2] |
Data released under the ODC-BY 1.0 license — See also our legal information page