 | 2010 |
| 8 |  | Gunnar Lucko,
Richard C. Thompson:
Derivation and assessment of interest in cash flow calculations for time-cost optimizations in construction project management.
Winter Simulation Conference 2010: 3037-3048 |
| 7 |  | Gunnar Lucko,
Perakath C. Benjamin,
Kannan Swaminathan,
Michael G. Madden:
Comparison of manual and automated simulation generation approaches and their use for construction applications.
Winter Simulation Conference 2010: 3132-3144 |
| 2009 |
| 6 |  | Gunnar Lucko,
Angel A. Pena Orozco:
Resource Leveling of Linear Schedules with Singularity Functions.
Winter Simulation Conference 2009: 2571-2582 |
| 5 |  | Gunnar Lucko,
Kannan Swaminathan,
Perakath C. Benjamin,
Michael G. Madden:
Rapid Deployment of Simulation Models for Building Construction Applications.
Winter Simulation Conference 2009: 2733-2744 |
| 2008 |
| 4 |  | Gunnar Lucko,
Perakath C. Benjamin,
Michael G. Madden:
Harnessing the power of simulation in the project management / decision support aspects of the construction industry.
Winter Simulation Conference 2008: 2479-2487 |
| 3 |  | Gunnar Lucko,
Angel A. Pena Orozco:
Calculating float in linear schedules with singularity functions.
Winter Simulation Conference 2008: 2512-2518 |
| 2007 |
| 2 |  | Gunnar Lucko:
Flexible modeling of linear schedules for integrated mathematical analysis.
Winter Simulation Conference 2007: 2159-2167 |
| 2005 |
| 1 |  | Gunnar Lucko:
Reviving a mechanistic view of CPM schedules in the age of information technology.
Winter Simulation Conference 2005: 1533-1540 |