 | 2012 |
| 34 |  | T. C. Edwin Cheng,
Bertrand M. T. Lin,
H. L. Huang:
Resource-constrained flowshop scheduling with separate resource recycling operations.
Computers & OR 39(6): 1206-1212 (2012) |
| 33 |  | F. J. Hwang,
Mikhail Y. Kovalyov,
Bertrand M. T. Lin:
Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence.
Discrete Optimization 9(1): 29-39 (2012) |
| 2011 |
| 32 |  | Sergey Sevastyanov,
Bertrand M. T. Lin:
Efficient enumeration of optimal and approximate solutions of a scheduling problem.
CTW 2011: 248-251 |
| 31 |  | F. J. Hwang,
Bertrand M. T. Lin:
Coupled-task scheduling on a single machine subject to a fixed-job-sequence.
Computers & Industrial Engineering 60(4): 690-698 (2011) |
| 30 |  | Ming-Tsung Chen,
Bertrand M. T. Lin,
Shian-Shyong Tseng:
Ant colony optimization for dynamic routing and wavelength assignment in WDM networks with sparse wavelength conversion.
Eng. Appl. of AI 24(2): 295-305 (2011) |
| 29 |  | Bertrand M. T. Lin,
F. J. Hwang:
Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type.
Inf. Process. Lett. 111(5): 208-212 (2011) |
| 28 |  | Sergey Sevastyanov,
Bertrand M. T. Lin,
Hsiao-Lan Huang:
Tight complexity analysis of the relocation problem with arbitrary release dates.
Theor. Comput. Sci. 412(35): 4536-4544 (2011) |
| 2010 |
| 27 |  | Tsu-Feng Ho,
Shyong Jian Shyu,
Yi-Ling Wu,
Bertrand M. T. Lin:
Discrete Particle Swarm Optimization for Materials Budget Allocation in Academic Libraries.
CSE 2010: 196-203 |
| 26 |  | Tsu-Feng Ho,
Shyong Jian Shyu,
Bertrand M. T. Lin,
Yi-Ling Wu:
An evolutionary approach to library materials acquisition problems.
IEEE Conf. of Intelligent Systems 2010: 450-455 |
| 25 |  | Stanislaw Gawiejnowicz,
Bertrand M. T. Lin:
Scheduling time-dependent jobs under mixed deterioration.
Applied Mathematics and Computation 216(2): 438-447 (2010) |
| 24 |  | Alexander V. Kononov,
Bertrand M. T. Lin:
Minimizing the total weighted completion time in the relocation problem.
J. Scheduling 13(2): 123-129 (2010) |
| 2009 |
| 23 |  | T. C. Edwin Cheng,
Bertrand M. T. Lin,
Y. Tian:
Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times.
Computers & OR 36(11): 3031-3040 (2009) |
| 22 |  | Feng-Cheng Lin,
Jen-Shin Hong,
Bertrand M. T. Lin:
A two-machine flowshop problem with processing time-dependent buffer constraints - An application in multimedia presentations.
Computers & OR 36(4): 1158-1175 (2009) |
| 21 |  | T. C. Edwin Cheng,
Bertrand M. T. Lin:
Johnson's rule, composite jobs and the relocation problem.
European Journal of Operational Research 192(3): 1008-1013 (2009) |
| 2008 |
| 20 |  | Ming-Tsung Chen,
Bertrand M. T. Lin,
Shian-Shyong Tseng:
Multicast routing and wavelength assignment with delay constraints in WDM networks with heterogeneous capabilities.
J. Network and Computer Applications 31(1): 47-65 (2008) |
| 2007 |
| 19 |  | Bertrand M. T. Lin,
Alexander V. Kononov:
Customer order scheduling to minimize the number of late jobs.
European Journal of Operational Research 183(2): 944-948 (2007) |
| 2006 |
| 18 |  | Ming-Tsung Chen,
Shian-Shyong Tseng,
Bertrand M. T. Lin:
Dynamic multicast routing under delay constraints in WDM networks with heterogeneous light splitting capabilities.
Computer Communications 29(9): 1492-1503 (2006) |
| 17 |  | Gwo-Jen Hwang,
Bertrand M. T. Lin,
Tsung-Liang Lin:
An effective approach for test-sheet composition with large-scale item banks.
Computers & Education 46(2): 122-139 (2006) |
| 16 |  | Shyong Jian Shyu,
Bertrand M. T. Lin,
Tsung-Shen Hsiao:
Ant colony optimization for the cell assignment problem in PCS networks.
Computers & OR 33: 1713-1740 (2006) |
| 15 |  | Alexander V. Kononov,
Bertrand M. T. Lin:
On relocation problems with multiple identical working crews.
Discrete Optimization 3(4): 366-381 (2006) |
| 14 |  | Bertrand M. T. Lin,
Hsiao-Lan Huang:
On the relocation problem with a second working crew for resource recycling.
Int. J. Systems Science 37(1): 27-34 (2006) |
| 2005 |
| 13 |  | Bertrand M. T. Lin,
T. C. Edwin Cheng:
Two-Machine Flowshop Batching and Scheduling.
Annals OR 133(1-4): 149-161 (2005) |
| 12 |  | Andy An-Kai Jeng,
Bertrand M. T. Lin:
Minimizing the total completion time in single-machine scheduling with step-deteriorating jobs.
Computers & OR 32: 521-536 (2005) |
| 11 |  | Gwo-Jen Hwang,
Bertrand M. T. Lin,
Hsien-Hao Tseng,
Tsung-Liang Lin:
On the development of a computer-assisted testing system with genetic test sheet-generating approach.
IEEE Transactions on Systems, Man, and Cybernetics, Part C 35(4): 590-594 (2005) |
| 2004 |
| 10 |  | Shyong Jian Shyu,
Peng-Yeng Yin,
Bertrand M. T. Lin:
An Ant Colony Optimization Algorithm for the Minimum Weight Vertex Cover Problem.
Annals OR 131(1-4): 283-304 (2004) |
| 9 |  | T. C. Edwin Cheng,
Qing Ding,
Bertrand M. T. Lin:
A concise survey of scheduling with time-dependent processing times.
European Journal of Operational Research 152(1): 1-13 (2004) |
| 2003 |
| 8 |  | Shyong Jian Shyu,
Peng-Yeng Yin,
Bertrand M. T. Lin,
Mohamed Haouari:
Ant-Tree: an ant colony optimization approach to the generalized minimum spanning tree problem.
J. Exp. Theor. Artif. Intell. 15(1): 103-112 (2003) |
| 2002 |
| 7 |  | Bertrand M. T. Lin:
Fabrication scheduling on a single machine with due date constraints.
European Journal of Operational Research 136(1): 95-105 (2002) |
| 2001 |
| 6 |  | Bertrand M. T. Lin,
T. C. Edwin Cheng:
Batch scheduling in the no-wait two-machine flowshop to minimize the makespan.
Computers & OR 28(7): 613-624 (2001) |
| 1999 |
| 5 |  | Bertrand M. T. Lin:
The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine.
Computers & OR 26(7): 695-698 (1999) |
| 4 |  | Bertrand M. T. Lin,
T. C. Edwin Cheng:
Minimizing the weighted number of tardy jobs and maximum tardiness in relocation problem with due date constraints.
European Journal of Operational Research 116(1): 183-193 (1999) |
| 1997 |
| 3 |  | Ceyda Oguz,
Bertrand M. T. Lin,
T. C. Edwin Cheng:
Two-stage flowshop scheduling with a common second-stage machine.
Computers & OR 24(12): 1169-1174 (1997) |
| 2 |  | Shian-Shyong Tseng,
Bertrand M. T. Lin,
Sue Huei Liu:
Construction N Latin Squares for ???.
J. Inf. Sci. Eng. 13(4): 605-613 (1997) |
| 1992 |
| 1 |  | Bertrand M. T. Lin,
Shian-Shyong Tseng:
Resource-Requirment Minimization in Relocation Problems with Precedence Constraints.
ICCI 1992: 26-29 |