 | 2011 |
| 39 |  | Saif Benjaafar,
Mohsen ElHafsi,
Chung-Yee Lee,
Weihua Zhou:
Technical Note - Optimal Control of an Assembly System with Multiple Stages and Multiple Demand Classes.
Operations Research 59(2): 522-529 (2011) |
| 2010 |
| 38 |  | Jinwen Ou,
Xiangtong Qi,
Chung-Yee Lee:
Parallel machine scheduling with multiple unloading servers.
J. Scheduling 13(3): 213-226 (2010) |
| 37 |  | H.-C. Hwang,
Wikrom Jaruphongsa,
Sila Çetinkaya,
Chung-Yee Lee:
Capacitated dynamic lot-sizing problem with delivery/production time windows.
Oper. Res. Lett. 38(5): 408-413 (2010) |
| 2009 |
| 36 |  | Feng Chen,
Chung-Yee Lee:
Minimizing the makespan in a two-machine cross-docking flow shop problem.
European Journal of Operational Research 193(1): 59-72 (2009) |
| 35 |  | Sean X. Zhou,
Xiuli Chao,
Chung-Yee Lee:
Optimal transportation policies for production/inventory systems with an unreliable and a reliable carrier.
J. Global Optimization 44(2): 251-271 (2009) |
| 34 |  | Ke Fu,
Vernon Ning Hsu,
Chung-Yee Lee:
Note - Optimal Component Acquisition for a Single-Product, Single-Demand Assemble-to-Order Problem with Expediting.
Manufacturing & Service Operations Management 11(2): 229-236 (2009) |
| 33 |  | Chung-Yee Lee,
Xiangtong Qi:
Vehicle scheduling with combinable delivery and pickup operations.
Oper. Res. Lett. 37(6): 399-404 (2009) |
| 32 |  | Ju-Liang Zhang,
Chung-Yee Lee,
Jian Chen:
Inventory control problem with freight cost and stochastic demand.
Oper. Res. Lett. 37(6): 443-446 (2009) |
| 2008 |
| 31 |  | Bo Chen,
Chung-Yee Lee:
Logistics scheduling with batching and transportation.
European Journal of Operational Research 189(3): 871-876 (2008) |
| 30 |  | Joseph Y.-T. Leung,
Chung-Yee Lee,
Chung W. Ng,
Gilbert H. Young:
Preemptive multiprocessor order scheduling to minimize total weighted flowtime.
European Journal of Operational Research 190(1): 40-51 (2008) |
| 29 |  | Chung-Yee Lee,
Gang Yu:
Parallel-machine scheduling under potential disruption.
Optimization Letters 2(1): 27-37 (2008) |
| 28 |  | Wikrom Jaruphongsa,
Chung-Yee Lee:
Dynamic lot-sizing problem with demand time windows and container-based transportation cost.
Optimization Letters 2(1): 39-51 (2008) |
| 2007 |
| 27 |  | Chung-Yee Lee,
Gang Yu:
Single machine scheduling under potential disruption.
Oper. Res. Lett. 35(4): 541-548 (2007) |
| 26 |  | Wikrom Jaruphongsa,
Sila Çetinkaya,
Chung-Yee Lee:
Outbound shipment mode considerations for integrated inventory and delivery lot-sizing decisions.
Oper. Res. Lett. 35(6): 813-822 (2007) |
| 2006 |
| 25 |  | Sila Çetinkaya,
Fatih Mutlu,
Chung-Yee Lee:
A comparison of outbound dispatch policies for integrated inventory and transportation decisions.
European Journal of Operational Research 171(3): 1094-1112 (2006) |
| 24 |  | Chung-Yee Lee,
Joseph Y.-T. Leung,
Gang Yu:
Two Machine Scheduling under Disruptions with Transportation Considerations.
J. Scheduling 9(1): 35-48 (2006) |
| 23 |  | Vernon Ning Hsu,
Chung-Yee Lee,
Kut C. So:
Optimal Component Stocking Policy for Assemble-to-Order Systems with Lead-Time-Dependent Component and Product Pricing.
Management Science 52(3): 337-351 (2006) |
| 22 |  | Irina V. Gribkovskaia,
Chung-Yee Lee,
Vitaly A. Strusevich,
Dominique de Werra:
Three is easy, two is hard: open shop sum-batch scheduling problem refined.
Oper. Res. Lett. 34(4): 459-464 (2006) |
| 21 |  | Ke Fu,
Vernon Ning Hsu,
Chung-Yee Lee:
Inventory and Production Decisions for an Assemble-to-Order System with Uncertain Demand and Limited Assembly Capacity.
Operations Research 54(6): 1137-1150 (2006) |
| 2005 |
| 20 |  | Chung-Lun Li,
George L. Vairaktarakis,
Chung-Yee Lee:
Machine scheduling with deliveries to multiple customer locations.
European Journal of Operational Research 164(1): 39-51 (2005) |
| 2004 |
| 19 |  | Yung-Chia Chang,
Chung-Yee Lee:
Machine scheduling with job delivery coordination.
European Journal of Operational Research 158(2): 470-487 (2004) |
| 18 |  | Chung-Yee Lee:
Inventory replenishment model: lot sizing versus just-in-time delivery.
Oper. Res. Lett. 32(6): 581-590 (2004) |
| 2003 |
| 17 |  | Chung-Yee Lee,
Sila Çetinkaya,
Wikrom Jaruphongsa:
A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse.
Operations Research 51(5): 735-747 (2003) |
| 2002 |
| 16 |  | Zhi-Long Chen,
Chung-Yee Lee:
Parallel machine scheduling with a common due window.
European Journal of Operational Research 136(3): 512-527 (2002) |
| 15 |  | George L. Vairaktarakis,
Xiaoqiang Cai,
Chung-Yee Lee:
Workforce planning in synchronous production systems.
European Journal of Operational Research 136(3): 551-572 (2002) |
| 2001 |
| 14 |  | Chung-Yee Lee,
Lei Lei:
Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases.
Annals OR 102(1-4): 287-307 (2001) |
| 13 |  | Chung-Yee Lee,
Chen-Sin Lin:
Single-machine scheduling with maintenance and repair rate-modifying activities.
European Journal of Operational Research 135(3): 493-513 (2001) |
| 2000 |
| 12 |  | Chung-Yee Lee,
Yong He,
Guochun Tang:
A note on "parallel machine scheduling with non-simultaneous machine available time".
Discrete Applied Mathematics 100(1-2): 133-135 (2000) |
| 11 |  | Xiaoqiang Cai,
Chung-Yee Lee,
Tin-Lam Wong:
Multiprocessor task scheduling to minimize the maximum tardiness and the total completion time.
IEEE Transactions on Robotics 16(6): 824-830 (2000) |
| 1999 |
| 10 |  | Chung-Yee Lee:
Two-machine flowshop scheduling with availability constraints.
European Journal of Operational Research 114(2): 420-429 (1999) |
| 1996 |
| 9 |  | Chung-Yee Lee,
Chung-Lun Li:
On the Fixed Interval Due-date Scheduling Problem.
Discrete Applied Mathematics 68(1-2): 101-117 (1996) |
| 1995 |
| 8 |  | Jeffrey W. Herrmann,
Chung-Yee Lee:
Solving a Class Scheduling Problem with a Genetic Algorithm.
INFORMS Journal on Computing 7(4): 443-452 (1995) |
| 1993 |
| 7 |  | Chung-Yee Lee,
Surya Danusaputro Liman:
Capacitated Two-Parallel Machines Scheduling to Minimize Sum of Job Completion Times.
Discrete Applied Mathematics 41(3): 211-222 (1993) |
| 6 |  | Surya Danusaputro Liman,
Chung-Yee Lee:
Error Bound of a Heuristic for the Common Due Date Scheduling Problem.
INFORMS Journal on Computing 5(4): 420-425 (1993) |
| 1992 |
| 5 |  | Chung-Yee Lee,
Surya Danusaputro Liman:
Single Machine Flow-Time Scheduling with Scheduled Maintenance.
Acta Inf. 29(4): 375-382 (1992) |
| 1991 |
| 4 |  | Chung-Yee Lee,
Surya Danusaputro Liman,
Chen-Sin Lin:
Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date.
Computers & OR 18(4): 379-389 (1991) |
| 3 |  | Chung-Yee Lee:
Parallel machines scheduling with nonsimultaneous machine available time.
Discrete Applied Mathematics 30(1): 53-61 (1991) |
| 1989 |
| 2 |  | Jing-Jang Hwang,
Yuan-Chieh Chow,
Frank D. Anger,
Chung-Yee Lee:
Scheduling Precedence Graphs in Systems with Interprocessor Communication Times.
SIAM J. Comput. 18(2): 244-257 (1989) |
| 1988 |
| 1 |  | Chung-Yee Lee,
J. David Massey:
Multiprocessor scheduling: combining LPT and MULTIFIT.
Discrete Applied Mathematics 20(3): 233-242 (1988) |