 | 2012 |
| 22 |  | Wen-Hung Kuo,
Dar-Li Yang:
A short note on "Proportionate flowshops with general position-dependent processing times".
Inf. Process. Lett. 112(12): 479-480 (2012) |
| 21 |  | Wen-Hung Kuo,
Chou-Jung Hsu,
Dar-Li Yang:
Worst-case and numerical analysis of heuristic algorithms for flowshop scheduling problems with a time-dependent learning effect.
Inf. Sci. 184(1): 282-297 (2012) |
| 20 |  | Wen-Hung Kuo,
Dar-Li Yang:
Single-machine scheduling with deteriorating jobs.
Int. J. Systems Science 43(1): 132-139 (2012) |
| 2011 |
| 19 |  | Dar-Li Yang,
Wen-Hung Kuo:
Scheduling with deteriorating jobs and learning effects.
Applied Mathematics and Computation 218(5): 2069-2073 (2011) |
| 18 |  | Wen-Hung Kuo,
Chou-Jung Hsu,
Dar-Li Yang:
Some unrelated parallel machine scheduling problems with past-sequence-dependent setup time and learning effects.
Computers & Industrial Engineering 61(1): 179-183 (2011) |
| 2010 |
| 17 |  | Dar-Li Yang,
Wen-Hung Kuo:
Some scheduling problems with deteriorating jobs and learning effects.
Computers & Industrial Engineering 58(1): 25-28 (2010) |
| 16 |  | Po-Hsiang Tsui,
Yin-Yin Liao,
Chien-Cheng Chang,
Wen-Hung Kuo,
King-Jen Chang,
Chih-Kuang Yeh:
Classification of Benign and Malignant Breast Tumors by 2-D Analysis Based on Contour Description and Scatterer Characterization.
IEEE Trans. Med. Imaging 29(2): 513-522 (2010) |
| 15 |  | Wen-Hung Kuo,
Dar-Li Yang:
Note on "Single-machine and flowshop scheduling with a general learning effect model" and "Some single-machine and m-machine flowshop scheduling problems with learning considerations".
Inf. Sci. 180(19): 3814-3816 (2010) |
| 14 |  | Wen-Hung Kuo,
Dar-Li Yang:
Erratum to: "Machine scheduling with a general learning effect" [Math. Comput. Modelling 51(1-2) (2010) 84-90].
Mathematical and Computer Modelling 51(5-6): 847-849 (2010) |
| 2009 |
| 13 |  | Dar-Li Yang,
Wen-Hung Kuo:
Single-machine scheduling with both deterioration and learning effects.
Annals OR 172(1): 315-327 (2009) |
| 12 |  | Li-Yu D. Liu,
Chien-Yu Chen,
Mei-Ju May Chen,
Ming-Shian Tsai,
Cho-Han S. Lee,
Tzu L. Phang,
Li-Yun Chang,
Wen-Hung Kuo,
Hsiao-Lin Hwa,
Huang-Chun Lien,
Shih-Ming Jung,
Yi-Shing Lin,
King-Jen Chang,
Fon-Jou Hsieh:
Statistical identification of gene association by CID in application of constructing ER regulatory network.
BMC Bioinformatics 10: (2009) |
| 11 |  | Dar-Li Yang,
Wen-Hung Kuo:
A single-machine scheduling problem with learning effects in intermittent batch production.
Computers & Industrial Engineering 57(3): 762-765 (2009) |
| 2008 |
| 10 |  | Dar-Li Yang,
Chou-Jung Hsu,
Wen-Hung Kuo:
A two-machine flowshop scheduling problem with a separated maintenance constraint.
Computers & OR 35(3): 876-883 (2008) |
| 9 |  | Dar-Li Yang,
Wen-Hung Kuo,
Maw-Sheng Chern:
Multi-family scheduling in a two-machine reentrant flow shop with setups.
European Journal of Operational Research 187(3): 1160-1170 (2008) |
| 8 |  | Wen-Hung Kuo,
Dar-Li Yang:
Parallel-machine scheduling with time dependent processing times.
Theor. Comput. Sci. 393(1-3): 204-210 (2008) |
| 2007 |
| 7 |  | Wen-Hung Kuo,
Dar-Li Yang:
Single-machine scheduling problems with start-time dependent processing time.
Computers & Mathematics with Applications 53(11): 1658-1664 (2007) |
| 6 |  | Wen-Hung Kuo,
Dar-Li Yang:
Single-machine scheduling problems with the time-dependent learning effect.
Computers & Mathematics with Applications 53(11): 1733-1739 (2007) |
| 5 |  | Wen-Hung Kuo,
Dar-Li Yang:
Single machine scheduling with past-sequence-dependent setup times and learning effects.
Inf. Process. Lett. 102(1): 22-26 (2007) |
| 2006 |
| 4 |  | Wen-Hung Kuo,
Dar-Li Yang:
Single-machine group scheduling with a time-dependent learning effect.
Computers & OR 33: 2099-2112 (2006) |
| 3 |  | Wen-Hung Kuo,
Dar-Li Yang:
Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect.
European Journal of Operational Research 174(2): 1184-1190 (2006) |
| 2 |  | Wen-Hung Kuo,
Dar-Li Yang:
Minimizing the makespan in a single machine scheduling problem with a time-based learning effect.
Inf. Process. Lett. 97(2): 64-67 (2006) |
| 1999 |
| 1 |  | Wen-Hung Kuo:
The development of a human-computer interactive scheduling system.
Int. J. Computer Integrated Manufacturing 12(2): 156-167 (1999) |