 | 2011 |
| 3 |  | B. Shahul Hamid Khan,
Kannan Govindan:
A multi-objective simulated annealing algorithm for permutation flow shop scheduling problem.
IJAOM 3(1): 88-100 (2011) |
| 2010 |
| 2 |  | B. Shahul Hamid Khan,
Kannan Govindan,
R. Jeyapaul:
Optimisation of genetic algorithm parameters in flow shop scheduling using grey relational analysis.
IJAOM 2(1/2): 25-45 (2010) |
| 2007 |
| 1 |  | B. Shahul Hamid Khan,
G. Prabhaharan,
P. Asokan:
A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
Int. J. Comput. Math. 84(12): 1731-1741 (2007) |