 | 2011 |
| 8 |  | Philippe Chrétienne,
Öncü Hazir,
Safia Kedad-Sidhoum:
Integrated batch sizing and scheduling on a single machine.
J. Scheduling 14(6): 541-555 (2011) |
| 2010 |
| 7 |  | Safia Kedad-Sidhoum,
Francis Sourd:
Fast neighborhood search for the single machine earliness-tardiness scheduling problem.
Computers & OR 37(8): 1464-1471 (2010) |
| 2009 |
| 6 |  | Nabil Absi,
Safia Kedad-Sidhoum:
The multi-item capacitated lot-sizing problem with safety stocks and demand shortage costs.
Computers & OR 36(11): 2926-2936 (2009) |
| 2008 |
| 5 |  | Nabil Absi,
Safia Kedad-Sidhoum:
The multi-item capacitated lot-sizing problem with setup times and shortage costs.
European Journal of Operational Research 185(3): 1351-1374 (2008) |
| 4 |  | Safia Kedad-Sidhoum,
Yasmin A. Rios-Solis,
Francis Sourd:
Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates.
European Journal of Operational Research 189(3): 1305-1316 (2008) |
| 3 |  | Francis Sourd,
Safia Kedad-Sidhoum:
A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem.
J. Scheduling 11(1): 49-58 (2008) |
| 2007 |
| 2 |  | Nabil Absi,
Safia Kedad-Sidhoum:
MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs.
RAIRO - Operations Research 41(2): 171-192 (2007) |
| 2003 |
| 1 |  | Francis Sourd,
Safia Kedad-Sidhoum:
The One-Machine Problem with Earliness and Tardiness Penalties.
J. Scheduling 6(6): 533-549 (2003) |