 | 2012 |
| 21 |  | Ali Naimi Sadigh,
Marzieh Mozafari,
Behrooz Karimi:
Manufacturer-retailer supply chain coordination: A bi-level programming approach.
Advances in Engineering Software 45(1): 144-152 (2012) |
| 2011 |
| 20 |  | Abbas Aghajani Bazzazi,
Morteza Osanloo,
Behrooz Karimi:
A New Fuzzy Multi Criteria Decision Making Model for Open PIT Mines Equipment Selection.
APJOR 28(3): 279-300 (2011) |
| 19 |  | M. Hekmatfar,
S. M. T. Fatemi Ghomi,
Behrooz Karimi:
Two stage reentrant hybrid flow shop with setup times and the criterion of minimizing makespan.
Appl. Soft Comput. 11(8): 4530-4539 (2011) |
| 18 |  | Majid Jaberipour,
Esmaile Khorram,
Behrooz Karimi:
Particle swarm algorithm for solving systems of nonlinear equations.
Computers & Mathematics with Applications 62(2): 566-576 (2011) |
| 17 |  | Abbas Aghajani Bazzazi,
Morteza Osanloo,
Behrooz Karimi:
Deriving preference order of open pit mines equipment through MADM methods: Application of modified VIKOR method.
Expert Syst. Appl. 38(3): 2550-2556 (2011) |
| 2010 |
| 16 |  | Ali Husseinzadeh Kashan,
Behrooz Karimi:
A new algorithm for constrained optimization inspired by the sport league championships.
IEEE Congress on Evolutionary Computation 2010: 1-8 |
| 15 |  | N. Rafiee Parsa,
Behrooz Karimi,
Ali Husseinzadeh Kashan:
A branch and price algorithm to minimize makespan on a single batch processing machine with non-identical job sizes.
Computers & OR 37(10): 1720-1730 (2010) |
| 14 |  | Ali Husseinzadeh Kashan,
Behrooz Karimi,
Fariborz Jolai:
An effective hybrid multi-objective genetic algorithm for bi-criteria scheduling on a single batch processing machine with non-identical job sizes.
Eng. Appl. of AI 23(6): 911-922 (2010) |
| 13 |  | Azadeh Noktehdan,
Behrooz Karimi,
Ali Husseinzadeh Kashan:
A differential evolution algorithm for the manufacturing cell formation problem using group based operators.
Expert Syst. Appl. 37(7): 4822-4829 (2010) |
| 12 |  | Milad Avazbeigi,
Seyed Hossein Hashemi Doulabi,
Behrooz Karimi:
Choosing the appropriate order in fuzzy time series: A new N-factor fuzzy time series for prediction of the auto industry production.
Expert Syst. Appl. 37(8): 5630-5639 (2010) |
| 11 |  | G. Reza Nasiri,
Hamid Davoudpour,
Behrooz Karimi:
A Lagrangian-Based Solution Algorithm for Strategic Supply Chain Distribution Design in Uncertain Environment.
International Journal of Information Technology and Decision Making 9(3): 393-418 (2010) |
| 2009 |
| 10 |  | Ali Husseinzadeh Kashan,
Behrooz Karimi:
A discrete particle swarm optimization algorithm for scheduling parallel machines.
Computers & Industrial Engineering 56(1): 216-223 (2009) |
| 9 |  | Ali Husseinzadeh Kashan,
Behrooz Karimi,
S. M. T. Fatemi Ghomi:
A note on minimizing makespan on a single batch processing machine with nonidentical job sizes.
Theor. Comput. Sci. 410(27-29): 2754-2758 (2009) |
| 2008 |
| 8 |  | Ali Husseinzadeh Kashan,
Behrooz Karimi,
Masoud Jenabi:
A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes.
Computers & OR 35(4): 1084-1098 (2008) |
| 2007 |
| 7 |  | H. Zolfi,
S. M. T. Fatemi Ghomi,
Behrooz Karimi:
Supply Chain Operations Planning with Setup Times and Multi Period Capacity Consumption.
APMS 2007: 69-76 |
| 6 |  | Masoud Jenabi,
S. M. T. Fatemi Ghomi,
S. Ali Torabi,
Behrooz Karimi:
Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines.
Applied Mathematics and Computation 186(1): 230-245 (2007) |
| 2006 |
| 5 |  | Ali Husseinzadeh Kashan,
Behrooz Karimi,
Fariborz Jolai:
Minimizing Makespan on a Single Batch Processing Machine with Non-identical Job Sizes: A Hybrid Genetic Approach.
EvoCOP 2006: 135-146 |
| 4 |  | Saied Samie,
Behrooz Karimi:
Two-Machine No-Wait Flow Shop Scheduling Problem with Precedence Constraints.
OR 2006: 191-196 |
| 3 |  | H. Khademi Zare,
S. M. T. Fatemi Ghomi,
Behrooz Karimi:
Developing a heuristic algorithm for order production planning using network models under uncertainty conditions.
Applied Mathematics and Computation 182(2): 1208-1218 (2006) |
| 2 |  | B. Akrami,
Behrooz Karimi,
S. M. Moattar Husseini:
Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: The finite horizon case.
Applied Mathematics and Computation 183(1): 634-645 (2006) |
| 1 |  | S. Ali Torabi,
S. M. T. Fatemi Ghomi,
Behrooz Karimi:
A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains.
European Journal of Operational Research 173(1): 173-189 (2006) |