 | 2012 |
| 22 |  | M. Bank,
S. M. T. Fatemi Ghomi,
Fariborz Jolai,
J. Behnamian:
Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration.
Advances in Engineering Software 47(1): 1-6 (2012) |
| 21 |  | J. Behnamian,
S. M. T. Fatemi Ghomi,
Fariborz Jolai,
O. Amirtaheri:
Minimizing makespan on a three-machine flowshop batch scheduling problem with transportation using genetic algorithm.
Appl. Soft Comput. 12(2): 768-777 (2012) |
| 20 |  | Javad Taheri-Tolgari,
Abolfazl Mirzazadeh,
Fariborz Jolai:
An inventory model for imperfect items under inflationary conditions with considering inspection errors.
Computers & Mathematics with Applications 63(6): 1007-1019 (2012) |
| 19 |  | Meysam Alizadeh,
Fariborz Jolai,
Majid Aminnayeri,
Roy Rada:
Comparison of different input selection algorithms in neuro-fuzzy modeling.
Expert Syst. Appl. 39(1): 1536-1544 (2012) |
| 18 |  | Fariborz Jolai,
Reza Tavakkoli-Moghaddam,
A. Golmohammadi,
Babak Javadi:
An Electromagnetism-like algorithm for cell formation and layout problem.
Expert Syst. Appl. 39(2): 2172-2182 (2012) |
| 2011 |
| 17 |  | M. Pazoki,
Seyyed M. T. Fatemi Ghomi,
Fariborz Jolai:
A new approach in supply chain modeling.
IEEM 2011: 955-958 |
| 16 |  | J. Rezaeian,
Nikbakhsh Javadian,
Reza Tavakkoli-Moghaddam,
Fariborz Jolai:
A hybrid approach based on the genetic algorithm and neural network to design an incremental cellular manufacturing system.
Appl. Soft Comput. 11(6): 4195-4202 (2011) |
| 15 |  | Amir Kamali,
S. M. T. Fatemi Ghomi,
Fariborz Jolai:
A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain.
Computers & Mathematics with Applications 62(8): 3251-3269 (2011) |
| 14 |  | Meysam Alizadeh,
Roy Rada,
Fariborz Jolai,
Elnaz Fotoohi:
An adaptive neuro-fuzzy system for stock portfolio analysis.
Int. J. Intell. Syst. 26(2): 99-114 (2011) |
| 13 |  | Mehrdad Mohammadi,
Fariborz Jolai,
Hamideh Rostami:
An M/M/c queue model for hub covering location problem.
Mathematical and Computer Modelling 54(11-12): 2623-2638 (2011) |
| 2010 |
| 12 |  | Fariborz Jolai,
Ghazal Assadipour:
A Hybrid Cellular Genetic Algorithm for Multi-objective Crew Scheduling Problem.
HAIS (1) 2010: 359-367 |
| 11 |  | Reza Tavakkoli-Moghaddam,
Babak Javadi,
Fariborz Jolai,
Ali Ghodratnama:
The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem.
Appl. Soft Comput. 10(3): 919-925 (2010) |
| 10 |  | Ali Husseinzadeh Kashan,
Behrooz Karimi,
Fariborz Jolai:
An effective hybrid multi-objective genetic algorithm for bi-criteria scheduling on a single batch processing machine with non-identical job sizes.
Eng. Appl. of AI 23(6): 911-922 (2010) |
| 2009 |
| 9 |  | Jalil Layegh,
Fariborz Jolai,
Mohsen Sadegh Amalnik:
A memetic algorithm for minimizing the total weighted completion time on a single machine under step-deterioration.
Advances in Engineering Software 40(10): 1074-1077 (2009) |
| 2007 |
| 8 |  | Alireza Rahimi-Vahed,
Masoud Rabbani,
Reza Tavakkoli-Moghaddam,
S. Ali Torabi,
Fariborz Jolai:
A multi-objective scatter search for a mixed-model assembly line sequencing problem.
Advanced Engineering Informatics 21(1): 85-99 (2007) |
| 7 |  | Fariborz Jolai,
M. J. Rezaee,
Masoud Rabbani,
J. Razmi,
Pariviz Fattahi:
Exact algorithm for bi-objective 0-1 knapsack problem.
Applied Mathematics and Computation 194(2): 544-551 (2007) |
| 6 |  | Fariborz Jolai,
Masoud Rabbani,
S. Amalnick,
A. Dabaghi,
M. Dehghan,
M. Yazadn Parast:
Genetic algorithm for bi-criteria single machine scheduling problem of minimizing maximum earliness and number of tardy jobs.
Applied Mathematics and Computation 194(2): 552-560 (2007) |
| 5 |  | Masoud Rabbani,
S. M. T. Fatemi Ghomi,
Fariborz Jolai,
N. S. Lahiji:
A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept.
European Journal of Operational Research 176(2): 794-808 (2007) |
| 2006 |
| 4 |  | Ali Husseinzadeh Kashan,
Behrooz Karimi,
Fariborz Jolai:
Minimizing Makespan on a Single Batch Processing Machine with Non-identical Job Sizes: A Hybrid Genetic Approach.
EvoCOP 2006: 135-146 |
| 3 |  | Alireza Rahimi-Vahed,
Masoud Rabbani,
Reza Tavakkoli-Moghaddam,
Fariborz Jolai,
Neda Manavizadeh:
Mixed-Model Assembly Line Sequencing Using Real Options.
OR 2006: 161-167 |
| 2005 |
| 2 |  | Reza Tavakkoli-Moghaddam,
Fariborz Jolai,
F. Vaziri,
P. K. Ahmed,
Amir Azaron:
A hybrid method for solving stochastic job shop scheduling problems.
Applied Mathematics and Computation 170(1): 185-206 (2005) |
| 1 |  | Fariborz Jolai:
Minimizing number of tardy jobs on a batch processing machine with incompatible job families.
European Journal of Operational Research 162(1): 184-190 (2005) |