 | 2011 |
| 26 |  | Jing Li,
Xue-Yi You,
Fen Wang,
Min Ji:
On Regulation of Urban Runoff Pollution Abatement.
CSISE (2) 2011: 645-650 |
| 25 |  | Jie Zhang,
Jing Li,
Xue-Yi You,
Min Ji:
Optimization of Urban Rainwater Drainage System with Help of Remote Sensing Technology.
CSISE (2) 2011: 651-656 |
| 24 |  | Chuanli Zhao,
Min Ji,
Hengyong Tang:
Parallel-machine scheduling with an availability constraint.
Computers & Industrial Engineering 61(3): 778-781 (2011) |
| 23 |  | Yong Zhang,
Dan Huang,
Min Ji,
Fu-Ding Xie:
Image segmentation using PSO and PCM with Mahalanobis distance.
Expert Syst. Appl. 38(7): 9036-9040 (2011) |
| 2010 |
| 22 |  | Min Ji,
Fengxiang Jin,
Xiangwei Zhao,
Bo Ai,
Ting Li:
Mine geological hazard multi-dimensional spatial data warehouse construction research.
Geoinformatics 2010: 1-5 |
| 21 |  | Min Ji,
Shanshan Wang,
Bo Ai,
Xiao Xu,
Xiaowen Zhao:
Spatio-temporal data integration for geologic hazards in mining area based on version-increment.
Geoinformatics 2010: 1-5 |
| 20 |  | Xiangwei Zhao,
Fengxiang Jin,
Min Ji,
Jian Wang,
Zhongxi Zhang:
E-Commerce and Aided Decision Support System of Logistics Based on Spatial Web Services.
ICEE 2010: 271-274 |
| 19 |  | Min Ji,
Yong Sun,
Fengxiang Jin,
Tao Jiang,
Jian Wang,
Xiaojing Yao:
Research and development of Field Data Collecting Synchronously System of Mining area.
IGARSS 2010: 3948-3951 |
| 18 |  | Tao Jiang,
Xiliang Ni,
Lei Fang,
Guolin Liu,
Min Ji,
Lin Sun:
Registration study of great resolution difference remote sensing image based on invariant feature.
IGARSS 2010: 995-998 |
| 17 |  | Min Ji,
Jun Xia:
Analysis of vehicle requirements in a general automated guided vehicle system based transportation system.
Computers & Industrial Engineering 59(4): 544-551 (2010) |
| 16 |  | Min Ji,
T. C. Edwin Cheng:
Scheduling resumable simple linear deteriorating jobs on a single machine with an availability constraint to minimize makespan.
Computers & Industrial Engineering 59(4): 794-798 (2010) |
| 15 |  | Min Ji,
T. C. Edwin Cheng:
Batch scheduling of simple linear deteriorating jobs on a single machine to minimize makespan.
European Journal of Operational Research 202(1): 90-98 (2010) |
| 14 |  | Yunyan Du,
Wei Wen,
Feng Cao,
Min Ji:
A case-based reasoning approach for land use change prediction.
Expert Syst. Appl. 37(8): 5745-5750 (2010) |
| 13 |  | Min Ji,
T. C. Edwin Cheng:
Scheduling with job-dependent learning effects and multiple rate-modifying activities.
Inf. Process. Lett. 110(11): 460-463 (2010) |
| 12 |  | Yong Zhang,
Fu-Ding Xie,
Dan Huang,
Min Ji:
Support vector classifier based on fuzzy c-means and Mahalanobis distance.
J. Intell. Inf. Syst. 35(2): 333-345 (2010) |
| 2009 |
| 11 |  | Bin Lu,
Min Ji,
Mengmeng Wang,
Jianbo Lv:
Ethanethiol Removal Using a Novel Plasma Reactor Combined with Mn/?-Al2O3.
ESIAT (1) 2009: 623-626 |
| 10 |  | Liuming Pan,
Min Ji,
Bin Lu,
Xiuduo Wang,
Lejun Zhao:
Degradation of Humic Acid by TiO2 Nonutubes/UV/O3.
ESIAT (2) 2009: 654-657 |
| 9 |  | Min Ji,
T. C. Edwin Cheng:
Parallel-machine scheduling of simple linear deteriorating jobs.
Theor. Comput. Sci. 410(38-40): 3761-3768 (2009) |
| 2008 |
| 8 |  | Min Ji,
T. C. Edwin Cheng:
Parallel-machine scheduling with simple linear deterioration to minimize total completion time.
European Journal of Operational Research 188(2): 342-347 (2008) |
| 7 |  | Min Ji,
T. C. Edwin Cheng:
An FPTAS for parallel-machine scheduling under a grade of service provision to minimize makespan.
Inf. Process. Lett. 108(4): 171-174 (2008) |
| 2007 |
| 6 |  | Min Ji,
Yong He,
T. C. Edwin Cheng:
Single-machine scheduling with periodic maintenance to minimize makespan.
Computers & OR 34(6): 1764-1770 (2007) |
| 5 |  | Min Ji,
Yong He,
T. C. Edwin Cheng:
A simple linear time algorithm for scheduling with step-improving processing times.
Computers & OR 34(8): 2396-2402 (2007) |
| 4 |  | Min Ji,
Yong He,
T. C. Edwin Cheng:
Batch delivery scheduling with batch delivery cost on a single machine.
European Journal of Operational Research 176(2): 745-755 (2007) |
| 3 |  | Min Ji,
T. C. Edwin Cheng:
An FPTAS for scheduling jobs with piecewise linear decreasing processing times to minimize makespan.
Inf. Process. Lett. 102(2-3): 41-47 (2007) |
| 2006 |
| 2 |  | T. C. Edwin Cheng,
Yong He,
Han Hoogeveen,
Min Ji,
Gerhard J. Woeginger:
Scheduling with step-improving processing times.
Oper. Res. Lett. 34(1): 37-40 (2006) |
| 1 |  | Min Ji,
Yong He,
T. C. Edwin Cheng:
Scheduling linear deteriorating jobs with an availability constraint on a single machine.
Theor. Comput. Sci. 362(1-3): 115-126 (2006) |