 | 2010 |
| 6 |  | Masoud Jenabi,
Bahman Naderi,
S. M. T. Fatemi Ghomi:
A bi-objective case of no-wait flowshops.
BIC-TA 2010: 1048-1056 |
| 5 |  | Bahman Naderi,
Masoud Jenabi,
S. M. T. Fatemi Ghomi,
Davoud Talebi:
An electromagnetism-like metaheuristic for sequence dependent open shop scheduling.
BIC-TA 2010: 489-497 |
| 2009 |
| 4 |  | Ali Husseinzadeh Kashan,
Masoud Jenabi,
Mina Husseinzadeh Kashan:
A New Solution Approach for Grouping Problems Based on Evolution Strategies.
SoCPaR 2009: 88-93 |
| 2008 |
| 3 |  | Ali Husseinzadeh Kashan,
Behrooz Karimi,
Masoud Jenabi:
A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes.
Computers & OR 35(4): 1084-1098 (2008) |
| 2007 |
| 2 |  | Masoud Jenabi,
S. Ali Torabi,
S. Afshin Mansouri:
A hybrid GA for a supply chain production planning problem.
GECCO 2007: 2045-2052 |
| 1 |  | Masoud Jenabi,
S. M. T. Fatemi Ghomi,
S. Ali Torabi,
Behrooz Karimi:
Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines.
Applied Mathematics and Computation 186(1): 230-245 (2007) |