 | 2011 |
| 16 |  | Jyh-Wen Ho,
Yeu-Shiang Huang:
A study on the life of an innovative product using a Bayesian approach.
Computers & Industrial Engineering 60(4): 666-676 (2011) |
| 15 |  | Yeu-Shiang Huang,
Wei-Jun Su,
Zu-Liang Lin:
A study on lead-time discount coordination for deteriorating products.
European Journal of Operational Research 215(2): 358-366 (2011) |
| 2010 |
| 14 |  | Chih-Chiang Fang,
Yeu-Shiang Huang:
A study on decisions of warranty, pricing, and production with insufficient information.
Computers & Industrial Engineering 59(2): 241-250 (2010) |
| 13 |  | Jyh-Wen Ho,
Yeu-Shiang Huang:
Cost allocation with learning and forgetting considerations in a monopolistically competitive market.
Int. J. Systems Science 41(10): 1133-1144 (2010) |
| 2009 |
| 12 |  | Jyh-Wen Ho,
Yeu-Shiang Huang:
A study on customer involvement in final assembly for DIY products.
Computers & Industrial Engineering 56(1): 19-27 (2009) |
| 11 |  | Yeu-Shiang Huang,
Bo-Chang Huang:
Recognition of multi-interval rules in dataset with continuous-valued attributes.
Expert Syst. Appl. 36(2): 1485-1492 (2009) |
| 10 |  | Kuei-Chen Chiu,
Jyh-Wen Ho,
Yeu-Shiang Huang:
Bayesian updating of optimal release time for software systems.
Software Quality Journal 17(1): 99-120 (2009) |
| 2008 |
| 9 |  | Yeu-Shiang Huang,
Chao-Ze Hsu:
An anticipative hyperbolic discount utility on intertemporal decision making.
European Journal of Operational Research 184(1): 281-290 (2008) |
| 8 |  | Chih-Chiang Fang,
Yeu-Shiang Huang:
A Bayesian decision analysis in determining the optimal policy for pricing, production, and warranty of repairable products.
Expert Syst. Appl. 35(4): 1858-1872 (2008) |
| 7 |  | Yeu-Shiang Huang,
Cheng-Han Hsieh,
Jyh-Wen Ho:
Decisions on an Optimal Life Test Sampling Plan With Warranty Considerations.
IEEE Transactions on Reliability 57(4): 643-649 (2008) |
| 6 |  | Kuei-Chen Chiu,
Yeu-Shiang Huang,
Tzai-Zang Lee:
A study of software reliability growth from the perspective of learning effects.
Rel. Eng. & Sys. Safety 93(10): 1410-1421 (2008) |
| 5 |  | Jyh-Wen Ho,
Chih-Chiang Fang,
Yeu-Shiang Huang:
The determination of optimal software release times at different confidence levels with consideration of learning effects.
Softw. Test., Verif. Reliab. 18(4): 221-249 (2008) |
| 2007 |
| 4 |  | Yeu-Shiang Huang,
Hui-Chen Wu:
A power law type of time preference on intertemporal choices.
European Journal of Operational Research 183(2): 718-728 (2007) |
| 2006 |
| 3 |  | Chi-Chang Chang,
Chuen-Sheng Cheng,
Yeu-Shiang Huang:
A Web-Based Decision Support System for Chronic Diseases.
J. UCS 12(1): 115-125 (2006) |
| 2004 |
| 2 |  | Yeu-Shiang Huang:
A structural design of decision support systems for deteriorating repairable systems.
Computers & OR 31(7): 1135-1145 (2004) |
| 1 |  | Yeu-Shiang Huang,
Chi-Chang Chang:
A study of defuzzification with experts' knowledge for deteriorating repairable systems.
European Journal of Operational Research 157(3): 658-670 (2004) |