 | 2011 |
| 15 |  | Zhe Liang,
Wanpracha Art Chaovalitwongse,
Huei Chuen Huang,
Ellis L. Johnson:
On a New Rotation Tour Network Model for Aircraft Maintenance Routing Problem.
Transportation Science 45(1): 109-120 (2011) |
| 2010 |
| 14 |  | Loo Hay Lee,
Huei Chuen Huang,
Peng Huang:
Flight assignment plan for an air cargo inbound terminal.
Winter Simulation Conference 2010: 1872-1881 |
| 13 |  | Dong Ling Han,
Loon Ching Tang,
Huei Chuen Huang:
A Markov model for single-leg air cargo revenue management under a bid-price policy.
European Journal of Operational Research 200(3): 800-811 (2010) |
| 12 |  | Huei Chuen Huang,
Haiqing Song:
Modified base-stock policies for semiconductor production system with dependent yield rates.
European Journal of Operational Research 207(1): 206-217 (2010) |
| 11 |  | Hainan Sun,
Huei Chuen Huang,
Wikrom Jaruphongsa:
The economic lot scheduling problem under extended basic period and power-of-two policy.
Optimization Letters 4(2): 157-172 (2010) |
| 2009 |
| 10 |  | Haiqing Song,
Huei Chuen Huang,
Ning Shi,
K. K. Lai:
A Dynamic Stochastic Network Model for Asset Allocation Problem.
CSO (2) 2009: 597-601 |
| 9 |  | Huei Chuen Huang,
Loo Hay Lee,
Haiqing Song,
Brian Thomas Eck:
SimMan - A simulation model for workforce capacity planning.
Computers & OR 36(8): 2490-2497 (2009) |
| 2008 |
| 8 |  | Rongheng Li,
Huei Chuen Huang:
A General k-Level Uncapacitated Facility Location Problem.
ICIC (3) 2008: 76-83 |
| 7 |  | Huei Chuen Huang,
Rongheng Li:
A k.
European Journal of Operational Research 185(2): 552-562 (2008) |
| 6 |  | Haiqing Song,
Huei Chuen Huang:
A successive convex approximation method for multistage workforce capacity planning problem with turnover.
European Journal of Operational Research 188(1): 29-48 (2008) |
| 2007 |
| 5 |  | Loo Hay Lee,
Ek Peng Chew,
Kok Choon Tan,
Huei Chuen Huang,
Wenquan Lin,
Yongbin Han,
Tian Heong Chan:
A simulation study on the uses of shuttle carriers in the container yard.
Winter Simulation Conference 2007: 1994-2002 |
| 4 |  | Rongheng Li,
Huei Chuen Huang:
List scheduling for jobs with arbitrary release times and similar lengths.
J. Scheduling 10(6): 365-373 (2007) |
| 2006 |
| 3 |  | Ek Peng Chew,
Huei Chuen Huang,
Ellis L. Johnson,
George L. Nemhauser,
Joel S. Sokol,
Chun How Leong:
Short-term booking of air cargo space.
European Journal of Operational Research 174(3): 1979-1990 (2006) |
| 2005 |
| 2 |  | Chulung Lee,
Huei Chuen Huang,
Paul Goldsman,
Bin Liu,
Zhiyong Xu:
Reservation storage policy for AS/RS at air cargo terminals.
Winter Simulation Conference 2005: 1627-1632 |
| 2003 |
| 1 |  | Loo Hay Lee,
Huei Chuen Huang,
Chulung Lee,
Ek Peng Chew,
Wikrom Jaruphongsa,
Yean Yik Yong,
Zhe Liang,
Chun How Leong,
Yen Ping Tan,
Kalyan Namburi,
Ellis L. Johnson,
Jerry Banks:
Simulation of airports/aviation systems: discrete event simulation model for airline operations: SIMAIR.
Winter Simulation Conference 2003: 1656-1662 |