 | 2009 |
| 6 |  | Ke Fu,
Vernon Ning Hsu,
Chung-Yee Lee:
Note - Optimal Component Acquisition for a Single-Product, Single-Demand Assemble-to-Order Problem with Expediting.
Manufacturing & Service Operations Management 11(2): 229-236 (2009) |
| 2006 |
| 5 |  | Vernon Ning Hsu,
Chung-Yee Lee,
Kut C. So:
Optimal Component Stocking Policy for Assemble-to-Order Systems with Lead-Time-Dependent Component and Product Pricing.
Management Science 52(3): 337-351 (2006) |
| 4 |  | Ke Fu,
Vernon Ning Hsu,
Chung-Yee Lee:
Inventory and Production Decisions for an Assemble-to-Order System with Uncertain Demand and Limited Assembly Capacity.
Operations Research 54(6): 1137-1150 (2006) |
| 2004 |
| 3 |  | Chung-Lun Li,
Vernon Ning Hsu,
Wen-Qiang Xiao:
Dynamic Lot Sizing with Batch Ordering and Truckload Discounts.
Operations Research 52(4): 639-654 (2004) |
| 2001 |
| 2 |  | Renato de Matta,
Vernon Ning Hsu,
Chang-Xue Feng:
Short-Term Capacity Adjustment with Offline Production for a Flexible Manufacturing System under Abnormal Disturbances.
Annals OR 107(1-4): 83-100 (2001) |
| 1997 |
| 1 |  | Vernon Ning Hsu,
Timothy J. Lowe,
Arie Tamir:
Structured p-facility location problems on the line solvable in polynomial time.
Oper. Res. Lett. 21(4): 159-164 (1997) |