 | 2009 |
| 7 |  | Hsi-Mei Hsu,
Tai-Sheng Su,
Muh-Cherng Wu,
Liang-Chuan Huang:
Multiple lot-sizing decisions with an interrupted geometric yield and variable production time.
Computers & Industrial Engineering 57(3): 699-706 (2009) |
| 6 |  | Hsi-Mei Hsu,
Yai Hsiung,
Ying-Zhi Chen,
Muh-Cherng Wu:
A GA methodology for the scheduling of yarn-dyed textile production.
Expert Syst. Appl. 36(10): 12095-12103 (2009) |
| 2008 |
| 5 |  | I-Hsuan Hong,
Hsi-Mei Hsu,
Yi-Mu Wu,
Chun-Shao Yeh:
Pricing decision and lead time setting in a duopoly semiconductor industry.
Winter Simulation Conference 2008: 2229-2236 |
| 2004 |
| 4 |  | Hsi-Mei Hsu,
Wen-Pai Wang:
Dynamic programming for delayed product differentiation.
European Journal of Operational Research 156(1): 183-193 (2004) |
| 2001 |
| 3 |  | Hsi-Mei Hsu,
Wen-Pai Wang:
Possibilistic programming in production planning of assemble-to-order environments.
Fuzzy Sets and Systems 119(1): 59-70 (2001) |
| 2000 |
| 2 |  | Hsi-Mei Hsu,
Yan-Kwang Chen:
Grey relation pattern recogniser for X-bar control charts.
IJMTM 1(2/3): 271-287 (2000) |
| 1997 |
| 1 |  | Hsi-Mei Hsu,
Chen-Tung Chen:
Fuzzy Credibility Relation Method for Multiple Criteria Decision-Making Problems.
Inf. Sci. 96(1&2): 79-91 (1997) |