![]() | ![]() |
| 2005 | ||
|---|---|---|
| 3 | Ilka Habenicht, Peter Gmilkowsky: Simulationsbasierte Bewertung von Reschedulingstrategien in der Halbleiterfertigung. SimVis 2005: 15-26 | |
| 2003 | ||
| 2 | Lars Mönch, Ilka Habenicht: Factory scheduling and dispatching: simulation-based assessment of batching heuristics in semiconductor manufacturing. Winter Simulation Conference 2003: 1338-1345 | |
| 2002 | ||
| 1 | Ilka Habenicht, Lars Mönch: Scheduling and dispatching: a finite-capacity beam-search-algorithm for production scheduling in semiconductor manufacturing. Winter Simulation Conference 2002: 1406-1413 | |
| 1 | Peter Gmilkowsky | [3] |
| 2 | Lars Mönch | [1] [2] |
Colors in the list of coauthors
Last update Wed May 30 22:34:44 2012 CET by the DBLP Team —
Data released under the ODC-BY 1.0 license — See also our legal information page