 | 2010 |
| 7 |  | Rene Driessel,
Udo Hönig,
Lars Mönch,
Wolfram Schiffmann:
A parallel shifting bottleneck heuristic for scheduling complex job shops: Architecture and performance assessment.
CASE 2010: 81-86 |
| 2008 |
| 6 |  | Bernhard Fechner,
Udo Hönig,
Jörg Keller,
Wolfram Schiffmann:
Fault-tolerant static scheduling for grids.
IPDPS 2008: 1-6 |
| 2006 |
| 5 |  | Udo Hönig,
Wolfram Schiffmann:
Improving the Efficiency of Functional Parallelism by Means of Hyper-Scheduling.
ICPP Workshops 2006: 283-290 |
| 2005 |
| 4 |  | Markus Bank,
Udo Hönig,
Wolfram Schiffmann:
An ACO-Based Approach for Scheduling Task Graphs with Communication Costs.
ICPP 2005: 623-629 |
| 2004 |
| 3 |  | Udo Hönig,
Wolfram Schiffmann:
Fast Optimal Task Graph Scheduling by Means of an Optimized Parallel A*-Algorithm.
PDPTA 2004: 842-848 |
| 2 |  | Udo Hönig,
Jörg Keller,
Wolfram Schiffmann:
Internet-basierter Übungsbetrieb in Technischer Informatik (Web-Based Exercises in Computer Engineering).
it - Information Technology 46(5): 255-264 (2004) |
| 2003 |
| 1 |  | Udo Hönig,
Wolfram Schiffmann:
A Parallel Branch-and-Bound Algorithm for Computing Optimal Task Graph Schedules.
GCC (2) 2003: 18-25 |