 | 2008 |
| 5 |  | Julius S. Gyorfi,
Chi-haur Wu:
An Efficient Algorithm for Placement Sequence and Feeder Assignment Problems With Multiple Placement-Nozzles and Independent Link Evaluation.
IEEE Transactions on Systems, Man, and Cybernetics, Part A 38(2): 437-442 (2008) |
| 4 |  | Julius S. Gyorfi,
Eric R. Buhrke,
Mark A. Tarlton,
Juan M. Lopez,
George T. Valliath:
Applying Telepresence to Incident Management: The Virtual Incident Command Center.
Presence 17(3): 231-241 (2008) |
| 2006 |
| 3 |  | Julius S. Gyorfi,
Chi-haur Wu:
A Minimum-Jerk Speed-Planning Algorithm for Coordinated Planning and Control of Automated Assembly Manufacturing.
IEEE T. Automation Science and Engineering 3(4): 454-462 (2006) |
| 2001 |
| 2 |  | Julius S. Gyorfi,
Chi-haur Wu:
A Hierarchical Model for Coordinated Planning and Control of Automated Assembly Manufacturing.
ICRA 2001: 1506-1511 |
| 2000 |
| 1 |  | Julius S. Gyorfi,
Chi-haur Wu:
Coordinated planning and control of automated assembly manufacturing.
IEEE Transactions on Systems, Man, and Cybernetics, Part A 30(2): 173-180 (2000) |