 | 2011 |
| 5 |  | Hua Gong,
Lixin Tang:
Two-machine flowshop scheduling with intermediate transportation under job physical space consideration.
Computers & OR 38(9): 1267-1274 (2011) |
| 2010 |
| 4 |  | Hua Gong,
Lixin Tang,
C. W. Duin:
A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times.
Computers & OR 37(5): 960-969 (2010) |
| 2009 |
| 3 |  | Guangmei Zhai,
Hua Gong,
Minqiang Wang,
Zhonghai Lin,
Kaiping Liu,
Daoli Zhang:
Low temperature growth of ZnO rods by EDTA-assisted hydrothermal synthesis.
NEMS 2009: 1088-1091 |
| 2008 |
| 2 |  | Hua Gong,
Lixin Tang:
A Two-Stage Flexible Flowshop Problem with Deterioration.
COCOON 2008: 651-660 |
| 1 |  | Hua Gong,
Lixin Tang:
The Coordination of Two Parallel Machines Scheduling and Batch Deliveries.
COCOON 2008: 670-677 |