![]() | ![]() |
S. M. T. Fatemi Ghomi
Amirkabir University of Technology
List of publications from the DBLP Bibliography Server - FAQ
| 2012 | ||
|---|---|---|
| 50 | M. Bank, S. M. T. Fatemi Ghomi, Fariborz Jolai, J. Behnamian: Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration. Advances in Engineering Software 47(1): 1-6 (2012) | |
| 49 | Siamak Baradaran, S. M. T. Fatemi Ghomi, M. Ranjbar, S. S. Hashemin: Multi-mode renewable resource-constrained allocation in PERT networks. Appl. Soft Comput. 12(1): 82-90 (2012) | |
| 48 | J. Behnamian, S. M. T. Fatemi Ghomi, Fariborz Jolai, O. Amirtaheri: Minimizing makespan on a three-machine flowshop batch scheduling problem with transportation using genetic algorithm. Appl. Soft Comput. 12(2): 768-777 (2012) | |
| 47 | H. Mosadegh, M. Zandieh, S. M. T. Fatemi Ghomi: Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines. Appl. Soft Comput. 12(4): 1359-1370 (2012) | |
| 46 | R. Sakiani, S. M. T. Fatemi Ghomi, M. Zandieh: Multi-objective supply planning for two-level assembly systems with stochastic lead times. Computers & OR 39(7): 1325-1332 (2012) | |
| 45 | K. Kianfar, S. M. T. Fatemi Ghomi, A. Oroojlooy Jadid: Study of stochastic sequence-dependent flexible flow shop via developing a dispatching rule and a hybrid GA. Eng. Appl. of AI 25(3): 494-506 (2012) | |
| 2011 | ||
| 44 | Nima Hamta, Seyyed M. T. Fatemi Ghomi, Mehrdad Hakimi-Asiabar, P. Hooshangi Tabrizi: Multi-objective assembly line balancing problem with bounded processing times, learning effect, and sequence-dependent setup times. IEEM 2011: 768-772 | |
| 43 | J. Behnamian, Seyyed M. T. Fatemi Ghomi, M. Zandieh: Hybrid solving algorithm for complex machine scheduling problem. IEEM 2011: 794-798 | |
| 42 | Rasul Jamshidi, Seyyed M. T. Fatemi Ghomi: Service impact on customer demand and member profit in a supply chain. IEEM 2011: 923-927 | |
| 41 | M. Pazoki, Seyyed M. T. Fatemi Ghomi, Fariborz Jolai: A new approach in supply chain modeling. IEEM 2011: 955-958 | |
| 40 | M. Hekmatfar, S. M. T. Fatemi Ghomi, Behrooz Karimi: Two stage reentrant hybrid flow shop with setup times and the criterion of minimizing makespan. Appl. Soft Comput. 11(8): 4530-4539 (2011) | |
| 39 | A. R. Boloori Arabani, M. Zandieh, S. M. T. Fatemi Ghomi: Multi-objective genetic-based algorithms for a cross-docking scheduling problem. Appl. Soft Comput. 11(8): 4954-4970 (2011) | |
| 38 | S. M. T. Fatemi Ghomi, S. A. Lesany, A. Koochakzadeh: Recognition of unnatural patterns in process control charts through combining two types of neural networks. Appl. Soft Comput. 11(8): 5444-5456 (2011) | |
| 37 | Amir Kamali, S. M. T. Fatemi Ghomi, Fariborz Jolai: A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain. Computers & Mathematics with Applications 62(8): 3251-3269 (2011) | |
| 36 | R. Sakiani, M. Zandieh, S. M. T. Fatemi Ghomi: Corrigendum to: "Genetic algorithm for supply planning in two-level assembly systems with random lead times" [Engineering Applications of Artificial Intelligence 22 (2009) 906-915]. Eng. Appl. of AI 24(5): 917-918 (2011) | |
| 35 | A. R. Boloori Arabani, S. M. T. Fatemi Ghomi, M. Zandieh: Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage. Expert Syst. Appl. 38(3): 1964-1979 (2011) | |
| 34 | E. Moradi, S. M. T. Fatemi Ghomi, M. Zandieh: Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem. Expert Syst. Appl. 38(6): 7169-7178 (2011) | |
| 33 | Mohammad Mohammadi, Seyyed M. T. Fatemi Ghomi: Genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups. Expert Syst. Appl. 38(6): 7201-7207 (2011) | |
| 32 | Mohammad Mohammadi, Seyyed M. T. Fatemi Ghomi, Niloofar Jafari: A genetic algorithm for simultaneous lotsizing and sequencing of the permutation flow shops with sequence-dependent setups. Int. J. Computer Integrated Manufacturing 24(1): 87-93 (2011) | |
| 31 | M. Narenji, S. M. T. Fatemi Ghomi, S. V. R. Nooraie: Grouping in decomposition method for multi-item capacitated lot-sizing problem with immediate lost sales and joint and item-dependent setup cost. Int. J. Systems Science 42(3): 489-498 (2011) | |
| 30 | B. Naderi, S. M. T. Fatemi Ghomi, M. Aminnayeri, M. Zandieh: Scheduling open shops with parallel machines to minimize total completion time. J. Computational Applied Mathematics 235(5): 1275-1287 (2011) | |
| 29 | H. Moheb Alizadeh, S. M. T. Fatemi Ghomi: Fuzzy development of Mean and Range control charts using statistical properties of different representative values. Journal of Intelligent and Fuzzy Systems 22(5-6): 253-265 (2011) | |
| 28 | J. Behnamian, M. Zandieh, S. M. T. Fatemi Ghomi: Bi-objective parallel machines scheduling with sequence-dependent setup times using hybrid metaheuristics and weighted min-max technique. Soft Comput. 15(7): 1313-1331 (2011) | |
| 2010 | ||
| 27 | Masoud Jenabi, Bahman Naderi, S. M. T. Fatemi Ghomi: A bi-objective case of no-wait flowshops. BIC-TA 2010: 1048-1056 | |
| 26 | Bahman Naderi, Masoud Jenabi, S. M. T. Fatemi Ghomi, Davoud Talebi: An electromagnetism-like metaheuristic for sequence dependent open shop scheduling. BIC-TA 2010: 489-497 | |
| 25 | Siamak Baradaran, S. M. T. Fatemi Ghomi, Mahdi Mobini, S. S. Hashemin: A hybrid scatter search approach for resource-constrained project scheduling problem in PERT-type networks. Advances in Engineering Software 41(7-8): 966-975 (2010) | |
| 24 | B. Naderi, S. M. T. Fatemi Ghomi, M. Aminnayeri: A high performing metaheuristic for job shop scheduling with sequence-dependent setup times. Appl. Soft Comput. 10(3): 703-710 (2010) | |
| 23 | Fardin Ahmadizar, Mehdi Ghazanfari, Seyyed M. T. Fatemi Ghomi: Group shops scheduling with makespan criterion subject to random release dates and processing times. Computers & OR 37(1): 152-162 (2010) | |
| 22 | B. Naderi, S. M. T. Fatemi Ghomi, M. Aminnayeri, M. Zandieh: A contribution and new heuristics for open shop scheduling. Computers & OR 37(1): 213-221 (2010) | |
| 21 | J. Behnamian, S. M. T. Fatemi Ghomi: Development of a PSO-SA hybrid metaheuristic for a new comprehensive regression model to time-series forecasting. Expert Syst. Appl. 37(2): 974-984 (2010) | |
| 2009 | ||
| 20 | J. Behnamian, M. Zandieh, S. M. T. Fatemi Ghomi: Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm. Expert Syst. Appl. 36(6): 9637-9644 (2009) | |
| 19 | J. Behnamian, S. M. T. Fatemi Ghomi, M. Zandieh: A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic. Expert Syst. Appl. 36(8): 11057-11069 (2009) | |
| 18 | A. Mirzazadeh, Mir Mehdi Seyyed Esfahani, S. M. T. Fatemi Ghomi: An inventory model under uncertain inflationary conditions, finite production rate and inflation-dependent demand rate for deteriorating items with shortages. Int. J. Systems Science 40(1): 21-31 (2009) | |
| 17 | Ali Husseinzadeh Kashan, Behrooz Karimi, S. M. T. Fatemi Ghomi: A note on minimizing makespan on a single batch processing machine with nonidentical job sizes. Theor. Comput. Sci. 410(27-29): 2754-2758 (2009) | |
| 2008 | ||
| 16 | Amir Azaron, S. M. T. Fatemi Ghomi: Lower bound for the mean project completion time in dynamic PERT networks. European Journal of Operational Research 186(1): 120-127 (2008) | |
| 2007 | ||
| 15 | H. Zolfi, S. M. T. Fatemi Ghomi, Behrooz Karimi: Supply Chain Operations Planning with Setup Times and Multi Period Capacity Consumption. APMS 2007: 69-76 | |
| 14 | Mohammad R. Gholamian, Seyyed M. T. Fatemi Ghomi: Meta knowledge of intelligent manufacturing: An overview of state-of-the-art. Appl. Soft Comput. 7(1): 1-16 (2007) | |
| 13 | Masoud Jenabi, S. M. T. Fatemi Ghomi, S. Ali Torabi, Behrooz Karimi: Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines. Applied Mathematics and Computation 186(1): 230-245 (2007) | |
| 12 | Masoud Rabbani, S. M. T. Fatemi Ghomi, Fariborz Jolai, N. S. Lahiji: A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept. European Journal of Operational Research 176(2): 794-808 (2007) | |
| 11 | Mohammad R. Gholamian, Seyyed M. T. Fatemi Ghomi, Mehdi Ghazanfari: Farsjum, a Fuzzy System for Ranking Sparse Judgment Matrices: a Case Study in Soccer tournaments. International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems 15(1): 115-129 (2007) | |
| 10 | Mohammad R. Gholamian, Seyyed M. T. Fatemi Ghomi, Mehdi Ghazanfari: A hybrid system for multiobjective problems - A case study in NP-hard problems. Knowl.-Based Syst. 20(4): 426-436 (2007) | |
| 2006 | ||
| 9 | M. Zandieh, S. M. T. Fatemi Ghomi, S. M. Moattar Husseini: An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Applied Mathematics and Computation 180(1): 111-127 (2006) | |
| 8 | H. Khademi Zare, S. M. T. Fatemi Ghomi, Behrooz Karimi: Developing a heuristic algorithm for order production planning using network models under uncertainty conditions. Applied Mathematics and Computation 182(2): 1208-1218 (2006) | |
| 7 | S. Ali Torabi, S. M. T. Fatemi Ghomi, Behrooz Karimi: A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains. European Journal of Operational Research 173(1): 173-189 (2006) | |
| 2005 | ||
| 6 | Mohammad R. Gholamian, Seyyed M. T. Fatemi Ghomi, Mehdi Ghazanfari: A hybrid systematic design for multiobjective market problems: a case study in crude oil markets. Eng. Appl. of AI 18(4): 495-509 (2005) | |
| 2004 | ||
| 5 | Mohammad R. Gholamian, Seyyed M. T. Fatemi Ghomi: An Empirical Research in Intelligent Manufacturing: A Frame Based Representation of AI Usages in Manufacturing Aspects. BASYS 2004: 161-172 | |
| 2003 | ||
| 4 | S. M. T. Fatemi Ghomi, Masoud Rabbani: A new structural mechanism for reducibility of stochastic PERT networks. European Journal of Operational Research 145(2): 394-402 (2003) | |
| 3 | Amir Azaron, S. M. T. Fatemi Ghomi: Optimal control of service rates and arrivals in Jackson networks. European Journal of Operational Research 147(1): 17-31 (2003) | |
| 2002 | ||
| 2 | S. M. T. Fatemi Ghomi, E. Teimouri: Path critical index and activity critical index in PERT networks. European Journal of Operational Research 141(1): 147-152 (2002) | |
| 1999 | ||
| 1 | S. M. T. Fatemi Ghomi, S. S. Hashemin: A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network. European Journal of Operational Research 114(3): 610-625 (1999) | |
Colors in the list of coauthors
Last update Wed May 30 22:34:44 2012 CET by the DBLP Team —
Data released under the ODC-BY 1.0 license — See also our legal information page