 | 2012 |
| 10 |  | Pilar I. Vidal-Carreras,
José Pedro García-Sabater,
Jairo R. Coronado-Hernandez:
Economic lot scheduling with deliberated and controlled coproduction.
European Journal of Operational Research 219(2): 396-404 (2012) |
| 2010 |
| 9 |  | José Pedro García-Sabater,
Jaime Lloret,
Juan A. Marin-Garcia,
Xavier Puig-Bernabeu:
Coordinating a Cooperative Automotive Manufacturing Network - An Agent-Based Model.
CDVE 2010: 231-238 |
| 2009 |
| 8 |  | Jaime Lloret,
José Pedro García-Sabater,
Juan A. Marin-Garcia:
Cooperative Supply Chain Re-scheduling: The Case of an Engine Supply Chain.
CDVE 2009: 376-383 |
| 2008 |
| 7 |  | Jaime Lloret,
José Pedro García-Sabater,
Juan A. Marin-Garcia:
Cooperative Multisite Production Re-scheduling.
CDVE 2008: 156-163 |
| 6 |  | Cristóbal Miralles,
José Pedro García-Sabater,
Carlos Andrés,
Manuel Cardós:
Branch and bound procedures for solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work centres for Disabled.
Discrete Applied Mathematics 156(3): 352-367 (2008) |
| 2007 |
| 5 |  | Josefa Mula,
Raul Poler,
José Pedro García-Sabater:
Material Requirement Planning with fuzzy constraints and fuzzy coefficients.
Fuzzy Sets and Systems 158(7): 783-793 (2007) |
| 2006 |
| 4 |  | Carlos Andrés,
Pedro Gomez,
José Pedro García-Sabater:
Comparing dispatching rules in dynamic hybrid flow shops.
ETFA 2006: 233-239 |
| 3 |  | Josefa Mula,
Raul Poler,
José Pedro García-Sabater:
Fuzzy Production Planning Model for Automobile Seat Assembling.
SMPS 2006: 163-171 |
| 2005 |
| 2 |  | Josefa Mula,
Raul Poler,
José Pedro García-Sabater:
A fuzzy approach to capacity constrained MRP systems.
EUSFLAT Conf. 2005: 547-552 |
| 1 |  | Carlos Andrés,
José Miguel Albarracín,
Guillermina Tormo,
Eduardo Vicens,
José Pedro García-Sabater:
Group technology in a hybrid flowshop environment: A case study.
European Journal of Operational Research 167(1): 272-281 (2005) |