 | 2011 |
| 9 |  | Ülkü Gürler,
C. Deniz Yenigün:
Full and conditional likelihood approaches for hazard change-point estimation with truncated and censored data.
Computational Statistics & Data Analysis 55(10): 2856-2870 (2011) |
| 8 |  | Yahya Saleh,
Ülkü Gürler,
Emre Berk:
Centralized and decentralized management of groundwater with multiple users.
European Journal of Operational Research 215(1): 244-256 (2011) |
| 2009 |
| 7 |  | Zümbül Bulut,
Ülkü Gürler,
Alper Sen:
Bundle pricing of inventories with stochastic demand.
European Journal of Operational Research 197(3): 897-911 (2009) |
| 2008 |
| 6 |  | Çerag Pinçe,
Ülkü Gürler,
Emre Berk:
A continuous review replenishment-disposal policy for an inventory system with autonomous supply and fixed disposal costs.
European Journal of Operational Research 190(2): 421-442 (2008) |
| 5 |  | Emre Berk,
Ülkü Gürler:
Analysis of the (Q, r) Inventory Model for Perishables with Positive Lead Times and Lost Sales.
Operations Research 56(5): 1238-1246 (2008) |
| 2007 |
| 4 |  | Emre Berk,
Ülkü Gürler,
Richard A. Levine:
Bayesian demand updating in the lost sales newsvendor problem: A two-moment approximation.
European Journal of Operational Research 182(1): 256-281 (2007) |
| 2002 |
| 3 |  | Savas Dayanik,
Ülkü Gürler:
An Adaptive Bayesian Replacement Policy with Minimal Repair.
Operations Research 50(3): 552-558 (2002) |
| 2001 |
| 2 |  | Eylem Tekin,
Ülkü Gürler,
Emre Berk:
Age-based vs. stock level control policies for a perishable inventory system.
European Journal of Operational Research 134(2): 309-329 (2001) |
| 2000 |
| 1 |  | Ülkü Gürler,
Mustafa Ç. Pinar,
Mohamed Mehdi Jelassi:
On closed-form solutions of a resource allocation problem in parallel funding of R&D projects.
Oper. Res. Lett. 27(5): 229-234 (2000) |