 | 2010 |
| 5 |  | Ewa Figielska:
Heuristic algorithms for preemptive scheduling in a two-stage hybrid flowshop with additional renewable resources at each stage.
Computers & Industrial Engineering 59(4): 509-519 (2010) |
| 2009 |
| 4 |  | Ewa Figielska:
A genetic algorithm and a simulated annealing algorithm combined with column generation technique for solving the problem of scheduling in the hybrid flowshop with additional resources.
Computers & Industrial Engineering 56(1): 142-151 (2009) |
| 2007 |
| 3 |  | Ewa Figielska:
Heuristic algorithms for scheduling in a multiprocessor two-stage flowshop with 0-1 resource requirements.
ICINCO-ICSO 2007: 452-455 |
| 2006 |
| 2 |  | Ewa Figielska:
Combining an Optimizing Method with a Genetic Algorithm to Solve a Flowshop Scheduling Problem with Additional Resources.
ETFA 2006: 1080-1086 |
| 1 |  | Ewa Figielska:
Preemptive scheduling in a two-stage multiprocessor flowshop with resource constraints.
ICINCO-ICSO 2006: 130-135 |