![]() | ![]() |
| 2006 | ||
|---|---|---|
| 2 | Karl W. Wagner, Walter Durr: A Five-Step Method for Value-Based Planning and Monitoring of Systems Engineering Projects. EUROMICRO-SEAA 2006: 282-290 | |
| 2005 | ||
| 1 | Karl W. Wagner, Walter Durr: Design failure cost as a measure of a process measurement system (a method for building the system and evaluating the measure). EUROMICRO-SEAA 2005: 214-221 | |
| 1 | Karl W. Wagner | [1] [2] |
Data released under the ODC-BY 1.0 license — See also our legal information page