![]() | ![]() |
| 2010 | ||
|---|---|---|
| 3 | Tao Wu, Leyuan Shi, N. A. Duffie: An HNP-MP Approach for the Capacitated Multi-Item Lot Sizing Problem With Setup Times. IEEE T. Automation Science and Engineering 7(3): 500-511 (2010) | |
| 2 | N. A. Duffie, Leyuan Shi: Dynamics of WIP Regulation in Large Production Networks of Autonomous Work Systems. IEEE T. Automation Science and Engineering 7(3): 665-670 (2010) | |
| 2008 | ||
| 1 | Tao Wu, Leyuan Shi, Benjamin Quirt, N. A. Duffie: Integrated dynamic and simulation model on coupled closed-loop workstation capacity controls in a multi-workstation production system. Winter Simulation Conference 2008: 1946-1951 | |
| 1 | Benjamin Quirt | [1] |
| 2 | Leyuan Shi | [1] [2] [3] |
| 3 | Tao Wu | [1] [3] |
Data released under the ODC-BY 1.0 license — See also our legal information page