 | 2012 |
| 12 |  | S. P. Anbuudayasankar,
K. Ganesh,
S. C. Lenny Koh,
Yves Ducq:
Modified savings heuristics and genetic algorithm for bi-objective vehicle routing problem with forced backhauls.
Expert Syst. Appl. 39(3): 2296-2305 (2012) |
| 2011 |
| 11 |  | Matthieu Lauras,
François Galasso,
Carine Rongier,
Didier Gourc,
Yves Ducq:
Towards a More Effective Interoperable Solution through an A-Priori Performance Measurement System.
PRO-VE 2011: 125-132 |
| 2010 |
| 10 |  | Mamadou Camara,
Yves Ducq,
Rémy Dupas:
Methodology for Prior Evaluation of Interoperability.
PRO-VE 2010: 697-704 |
| 2009 |
| 9 |  | Michel Ravelomanantsoa,
Yves Ducq,
Bruno Vallespir:
Integration of Requirements for Performance Indicator System Definition and Implementation Methods.
APMS 2009: 530-537 |
| 8 |  | Guillaume Vicien,
Yves Ducq,
Bruno Vallespir:
Contribution to Interoperability of Decision Support Systems Focusing on the Data Recovery Process.
IESA 2009: 3-9 |
| 2007 |
| 7 |  | Séverine Blanc,
Yves Ducq,
Bruno Vallespir:
A Graph based approach for interoperability evaluation.
IESA 2007: 273-276 |
| 6 |  | Reyes Grangel,
Ramzi Ben Salem,
Jean Pierre Bourey,
Nicolas Daclin,
Yves Ducq:
Transforming GRAI Extended Actigrams into UML Activity Diagrams: a First Step to Model Driven Interoperability.
IESA 2007: 447-458 |
| 5 |  | Séverine Blanc,
Yves Ducq,
Bruno Vallespir:
Evolution management towards interoperable supply chains using performance measurement.
Computers in Industry 58(7): 720-732 (2007) |
| 2006 |
| 4 |  | Yves Ducq,
Bruno Vallespir:
Reference Models for Mass Customisation Production of High Fashionable Products: Application to the Shoe Manufacturing Domain.
APMS 2006: 165-173 |
| 2004 |
| 3 |  | Yves Ducq,
David Chen,
Bruno Vallespir:
Interoperability in enterprise modelling: requirements and roadmap.
Advanced Engineering Informatics 18(4): 193-203 (2004) |
| 1996 |
| 2 |  | Guy Doumeingts,
Yves Ducq:
Production management: which future?.
APMS 1996: 18-28 |
| 1994 |
| 1 |  | Guy Doumeingts,
François Marcotte,
Yves Ducq:
A Methodology to Evaluate the Best Industrial Practices in the Frame of the IMS Programme: GLOBEMAN 21.
Production Management Methods 1994: 19-29 |