 | 2012 |
| 6 |  | Inna G. Drobouchevitch,
Jeffrey B. Sidney:
Minimization of earliness, tardiness and due date penalties on uniform parallel machines with identical jobs.
Computers & OR 39(9): 1919-1926 (2012) |
| 2010 |
| 5 |  | Inna G. Drobouchevitch,
H. Neil Geismar,
Chelliah Sriskandarajah:
Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models.
European Journal of Operational Research 206(3): 623-633 (2010) |
| 2006 |
| 4 |  | Inna G. Drobouchevitch,
Suresh P. Sethi,
Chelliah Sriskandarajah:
Scheduling dual gripper robotic cell: One-unit cycles.
European Journal of Operational Research 171(2): 598-631 (2006) |
| 2004 |
| 3 |  | Chelliah Sriskandarajah,
Inna G. Drobouchevitch,
Suresh P. Sethi,
Ramaswamy Chandrasekaran:
Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot.
Operations Research 52(1): 65-82 (2004) |
| 2001 |
| 2 |  | Inna G. Drobouchevitch,
Vitaly A. Strusevich:
Two-stage open shop scheduling with a bottleneck machine.
European Journal of Operational Research 128(1): 159-174 (2001) |
| 2000 |
| 1 |  | Inna G. Drobouchevitch,
Vitaly A. Strusevich:
Heuristics for the two-stage job shop scheduling problem with a bottleneck machine.
European Journal of Operational Research 123(2): 229-240 (2000) |