 | 2010 |
| 21 |  | Dirk Briskorn,
Andreas Drexl,
Frits C. R. Spieksma:
Round robin tournaments and three index assignments.
4OR 8(4): 365-374 (2010) |
| 20 |  | Yury Nikulin,
Andreas Drexl:
Theoretical aspects of multicriteria flight gate scheduling: deterministic and fuzzy models.
J. Scheduling 13(3): 261-280 (2010) |
| 2009 |
| 19 |  | Dirk Briskorn,
Andreas Drexl:
IP models for round robin tournaments.
Computers & OR 36(3): 837-852 (2009) |
| 18 |  | Dirk Briskorn,
Andreas Drexl:
A branching scheme for finding cost-minimal round robin tournaments.
European Journal of Operational Research 197(1): 68-76 (2009) |
| 17 |  | Andreas Drexl,
Kurt Jørnsten,
Diether Knof:
Non-linear anonymous pricing combinatorial auctions.
European Journal of Operational Research 199(1): 296-302 (2009) |
| 16 |  | Dirk Briskorn,
Andreas Drexl:
A branch-and-price algorithm for scheduling sport leagues.
JORS 60(1): 84-93 (2009) |
| 2006 |
| 15 |  | Dirk Briskorn,
Andreas Drexl:
Branching Based on Home-Away-Pattern Sets.
OR 2006: 523-528 |
| 14 |  | Thomas Bartsch,
Andreas Drexl,
Stefan Kröger:
Scheduling the professional soccer leagues of Austria and Germany.
Computers & OR 33: 1907-1937 (2006) |
| 13 |  | Andreas Drexl,
Alf Kimms,
Lars Matthießen:
Algorithms for the car sequencing and the level scheduling problem.
J. Scheduling 9(2): 153-176 (2006) |
| 2005 |
| 12 |  | Andreas Klose,
Andreas Drexl:
Facility location models for distribution system design.
European Journal of Operational Research 162(1): 4-29 (2005) |
| 11 |  | Can Akkan,
Andreas Drexl,
Alf Kimms:
Network decomposition-based benchmark results for the discrete time-cost tradeoff problem.
European Journal of Operational Research 165(2): 339-358 (2005) |
| 10 |  | Can Akkan,
Andreas Drexl,
Alf Kimms:
Generating two-terminal directed acyclic graphs with a given complexity index by constraint logic programming.
J. Log. Algebr. Program. 62(1): 1-39 (2005) |
| 9 |  | Andreas Klose,
Andreas Drexl:
Lower Bounds for the Capacitated Facility Location Problem Based on Column Generation.
Management Science 51(11): 1689-1705 (2005) |
| 2001 |
| 8 |  | Andreas Schirmer,
Andreas Drexl:
Allocation of partially renewable resources: Concept, capabilities, and applications.
Networks 37(1): 21-34 (2001) |
| 2000 |
| 7 |  | Andreas Drexl,
Rüdiger Nissen,
James H. Patterson,
Frank Salewski:
ProGen/pix - An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions.
European Journal of Operational Research 125(1): 59-72 (2000) |
| 1999 |
| 6 |  | Peter Brucker,
Andreas Drexl,
Rolf H. Möhring,
Klaus Neumann,
Erwin Pesch:
Resource-constrained project scheduling: Notation, classification, models, and methods.
European Journal of Operational Research 112(1): 3-41 (1999) |
| 1998 |
| 5 |  | Ulrich Dorndorf,
Andreas Drexl,
Erwin Pesch,
Toàn Phan Huy:
Adaptive Suchverfahren zur Projektplanung bei beschränkten Ressourcen.
KI 12(4): 25-32 (1998) |
| 4 |  | Alf Kimms,
Andreas Drexl:
Proportional lot sizing and scheduling: Some extensions.
Networks 32(2): 85-101 (1998) |
| 3 |  | Sönke Hartmann,
Andreas Drexl:
Project scheduling with multiple modes: A comparison of exact algorithms.
Networks 32(4): 283-297 (1998) |
| 1995 |
| 2 |  | Carsten Jordan,
Andreas Drexl:
A Comparison of Constraint and Mixed-Integer Programming Solvers for Batch Sequencing with Sequence-Dependent Setups.
INFORMS Journal on Computing 7(2): 160-165 (1995) |
| 1990 |
| 1 |  | Andreas Drexl:
Job-Prozessor-Scheduling für heterogene Computernetzwerke.
Wirtschaftsinformatik 32(4): 345-351 (1990) |