 | 2008 |
| 5 |  | Mario Vanhoucke,
José Coelho,
Dieter Debels,
Broos Maenhout,
Luís Valadares Tavares:
An evaluation of the adequacy of project network generators with systematically sampled networks.
European Journal of Operational Research 187(2): 511-524 (2008) |
| 2007 |
| 4 |  | Dieter Debels,
Mario Vanhoucke:
A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem.
Operations Research 55(3): 457-469 (2007) |
| 2006 |
| 3 |  | Dieter Debels,
Bert De Reyck,
Roel Leus,
Mario Vanhoucke:
A hybrid scatter search/electromagnetism meta-heuristic for project scheduling.
European Journal of Operational Research 169(2): 638-653 (2006) |
| 2005 |
| 2 |  | Dieter Debels,
Mario Vanhoucke:
The Electromagnetism Meta-heuristic Applied to the Resource-Constrained Project Scheduling Problem.
Artificial Evolution 2005: 259-270 |
| 1 |  | Dieter Debels,
Mario Vanhoucke:
A Bi-population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem.
ICCSA (4) 2005: 378-387 |