 | 2011 |
| 13 |  | Li-Pei Wong,
Malcolm Yoke-Hean Low,
Chin Soon Chong:
Finding the Shortest Hamiltonian Circuit of Selected Places in Penang Using a Generic Bee Colony Optimization Framework.
BIC-TA 2011: 51-57 |
| 2010 |
| 12 |  | Li-Pei Wong,
Chi Yung Puan,
Malcolm Yoke-Hean Low,
Yi Wen Wong,
Chin Soon Chong:
Bee colony optimisation algorithm with big valley landscape exploitation for job shop scheduling problems.
IJBIC 2(2): 85-99 (2010) |
| 11 |  | Li-Pei Wong,
Malcolm Yoke-Hean Low,
Chin Soon Chong:
Bee Colony Optimization with Local Search for Traveling Salesman Problem.
International Journal on Artificial Intelligence Tools 19(3): 305-334 (2010) |
| 2008 |
| 10 |  | Li-Pei Wong,
Malcolm Yoke-Hean Low,
Chin Soon Chong:
A Bee Colony Optimization Algorithm for Traveling Salesman Problem.
Asia International Conference on Modelling and Simulation 2008: 818-823 |
| 9 |  | Li-Pei Wong,
Chi Yung Puan,
Malcolm Yoke-Hean Low,
Chin Soon Chong:
Bee Colony Optimization algorithm with Big Valley landscape exploitation for Job Shop Scheduling problems.
Winter Simulation Conference 2008: 2050-2058 |
| 2006 |
| 8 |  | Chin Soon Chong,
Appa Iyer Sivakumar,
Malcolm Yoke-Hean Low,
Kheng Leng Gay:
A bee colony optimization algorithm to job shop scheduling.
Winter Simulation Conference 2006: 1954-1961 |
| 2005 |
| 7 |  | Chin Soon Chong,
Malcolm Yoke-Hean Low,
Appa Iyer Sivakumar,
Kheng Leng Gay:
Using simulation based approach to improve on the mean cycle time performance of dispatching rules.
Winter Simulation Conference 2005: 2194-2202 |
| 2004 |
| 6 |  | Nirupam Julka,
Peter Lendermann,
Chin Soon Chong,
Long-Foong Mike Liow:
Analysis and Enhancement of Planning and Scheduling Applications in a Distributed Simulation Testbed.
Winter Simulation Conference 2004: 1799- |
| 5 |  | Chin Soon Chong,
Peter Lendermann,
Boon-Ping Gan,
Brett Marc Duarte,
John W. Fowler,
Thomas E. Callarman:
Analysis of a Customer Demand Driven Semiconductor Supply Chain in a Distributed Simulation Test Bed.
Winter Simulation Conference 2004: 1902- |
| 2003 |
| 4 |  | Chin Soon Chong,
Appa Iyer Sivakumar,
Robert K. L. Gay:
Factory scheduling: simulation based scheduling using a two-pass approach.
Winter Simulation Conference 2003: 1433-1439 |
| 3 |  | Chin Soon Chong,
Appa Iyer Sivakumar,
Robert K. L. Gay:
Dynamic scheduling I: simulation-based scheduling for dynamic discrete manufacturing.
Winter Simulation Conference 2003: 1465-1473 |
| 2002 |
| 2 |  | Chin Soon Chong,
Appa Iyer Sivakumar,
Robert K. L. Gay:
Semiconductor manufacturing: design, development and application of an object oriented simulation toolkit for real-time semiconductor manufacturing scheduling.
Winter Simulation Conference 2002: 1849-1856 |
| 2000 |
| 1 |  | Appa Iyer Sivakumar,
Chin Soon Chong:
Development of an Object Oriented Simulation Engine for On-Line Simulation and Optimization.
Annual Simulation Symposium 2000: 291-298 |