![]() | ![]() |
| 2011 | ||
|---|---|---|
| 3 | Hyun-Seon Choi, Ji-Su Kim, Dong-Ho Lee: Real-time scheduling for reentrant hybrid flow shops: A decision tree based mechanism and its application to a TFT-LCD line. Expert Syst. Appl. 38(4): 3514-3521 (2011) | |
| 2009 | ||
| 2 | Hyun-Seon Choi, Dong-Ho Lee: Scheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops. Computers & Industrial Engineering 56(1): 113-120 (2009) | |
| 2006 | ||
| 1 | Sang-Il Kim, Hyun-Seon Choi, Dong-Ho Lee: Tabu Search Heuristics for Parallel Machine Scheduling with Sequence-Dependent Setup and Ready Times. ICCSA (3) 2006: 728-737 | |
| 1 | Ji-Su Kim | [3] |
| 2 | Sang-Il Kim | [1] |
| 3 | Dong-Ho Lee | [1] [2] [3] |
Data released under the ODC-BY 1.0 license — See also our legal information page