 | 2012 |
| 13 |  | Yuan-Shyi Peter Chiu,
Kuang-Ku Chen,
Chia-Kuan Ting:
Replenishment run time problem with machine breakdown and failure in rework.
Expert Syst. Appl. 39(1): 1291-1297 (2012) |
| 12 |  | Singa Wang Chiu,
Yuan-Shyi Peter Chiu,
Jyh-Chau Yang:
Combining an alternative multi-delivery policy into economic production lot size problem with partial rework.
Expert Syst. Appl. 39(3): 2578-2583 (2012) |
| 2011 |
| 11 |  | Yuan-Shyi Peter Chiu,
Hong-Dar Lin,
Ming-Hon Hwang,
Nong Pan:
Computational Optimization of Manufacturing Batch Size and Shipment for an Integrated EPQ Model with Scrap.
American J. Computational Mathematics 1(3): 202-207 (2011) |
| 10 |  | Yuan-Shyi Peter Chiu,
Hong-Dar Lin,
Huei-Hsin Chang:
Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown.
Computers & Industrial Engineering 60(4): 576-584 (2011) |
| 9 |  | Yuan-Shyi Peter Chiu,
Shang-Chih Liu,
Chun-Lin Chiu,
Huei-Hsin Chang:
Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments.
Mathematical and Computer Modelling 54(9-10): 2165-2174 (2011) |
| 2010 |
| 8 |  | Yuan-Shyi Peter Chiu,
Feng-Tsung Cheng,
Huei-Hsin Chang:
Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework.
Appl. Math. Lett. 23(10): 1152-1155 (2010) |
| 7 |  | Yuan-Shyi Peter Chiu,
Kuang-Ku Chen,
Feng-Tsung Cheng,
Mei-Fang Wu:
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown.
Computers & Mathematics with Applications 59(2): 919-932 (2010) |
| 6 |  | Yuan-Shyi Peter Chiu,
Chia-Kuan Ting:
A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns".
European Journal of Operational Research 201(2): 641-643 (2010) |
| 2009 |
| 5 |  | Hong-Dar Lin,
Yuan-Shyi Peter Chiu,
Wan-Ting Lin:
Automated Industrial Inspection of Light-emitting Diodes Using Computer Vision.
IPCV 2009: 59-65 |
| 4 |  | Yuan-Shyi Peter Chiu,
Hong-Dar Lin:
A hybrid approach based on Hotelling statistics for automated visual inspection of display blemishes in LCD panels.
Expert Syst. Appl. 36(10): 12332-12339 (2009) |
| 2008 |
| 3 |  | Hong-Dar Lin,
Yuan-Shyi Peter Chiu,
Chia-Kuan Ting:
A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging.
Computers & Mathematics with Applications 56(11): 2819-2824 (2008) |
| 2007 |
| 2 |  | Singa Wang Chiu,
Shan-Ling Wang,
Yuan-Shyi Peter Chiu:
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns.
European Journal of Operational Research 180(2): 664-676 (2007) |
| 1 |  | Singa Wang Chiu,
Chia-Kuan Ting,
Yuan-Shyi Peter Chiu:
Optimal production lot sizing with rework, scrap rate, and service level constraint.
Mathematical and Computer Modelling 46(3-4): 535-549 (2007) |