 | 2012 |
| 9 |  | Kuang-Ku Chen,
Mei-Fang Wu,
Singa Wang Chiu,
Chien-Hua Lee:
Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework.
Expert Syst. Appl. 39(2): 2232-2235 (2012) |
| 8 |  | Singa Wang Chiu,
Yuan-Shyi Peter Chiu,
Jyh-Chau Yang:
Combining an alternative multi-delivery policy into economic production lot size problem with partial rework.
Expert Syst. Appl. 39(3): 2578-2583 (2012) |
| 2011 |
| 7 |  | Hong-Dar Lin,
Singa Wang Chiu:
Flaw detection of domed surfaces in LED packages by machine vision system.
Expert Syst. Appl. 38(12): 15208-15216 (2011) |
| 2010 |
| 6 |  | Singa Wang Chiu:
Robust planning in optimization for production system subject to random machine breakdown and failure in rework.
Computers & OR 37(5): 899-908 (2010) |
| 2008 |
| 5 |  | Singa Wang Chiu:
Production lot size problem with failure in repair and backlogging derived without derivatives.
European Journal of Operational Research 188(2): 610-615 (2008) |
| 2007 |
| 4 |  | Hong-Dar Lin,
Chung-Yu Chung,
Singa Wang Chiu:
Computer-Aided Vision System for Surface Blemish Detection of LED Chips.
ICANNGA (2) 2007: 525-533 |
| 3 |  | Singa Wang Chiu,
Shan-Ling Wang,
Yuan-Shyi Peter Chiu:
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns.
European Journal of Operational Research 180(2): 664-676 (2007) |
| 2 |  | Singa Wang Chiu,
Chia-Kuan Ting,
Yuan-Shyi Peter Chiu:
Optimal production lot sizing with rework, scrap rate, and service level constraint.
Mathematical and Computer Modelling 46(3-4): 535-549 (2007) |
| 2006 |
| 1 |  | Hong-Dar Lin,
Singa Wang Chiu:
Computer-Aided Vision System for MURA-Type Defect Inspection in Liquid Crystal Displays.
PSIVT 2006: 442-452 |