 | 2012 |
| 17 |  | Ping-Teng Chang,
Jung-Hua Lee:
A fuzzy DEA and knapsack formulation integrated model for project selection.
Computers & OR 39(1): 112-125 (2012) |
| 2010 |
| 16 |  | Kuo-Ping Lin,
Ping-Teng Chang,
Kuo-Chen Hung,
Ping-Feng Pai:
A simulation of vendor managed inventory dynamics using fuzzy arithmetic operations with genetic algorithms.
Expert Syst. Appl. 37(3): 2571-2579 (2010) |
| 15 |  | Ping-Feng Pai,
Kuo-Ping Lin,
Chi-Shen Lin,
Ping-Teng Chang:
Time series forecasting by a seasonal support vector regression model.
Expert Syst. Appl. 37(6): 4261-4265 (2010) |
| 14 |  | Ping-Teng Chang,
Chih-Sheng Lin,
Kuo-Chen Hung,
Han-Hsiang Lee,
Ching-Hsiang Chang:
Collaboration and Competition Process: A Multi-Teams and Genetic Algorithm Hybrid Approach.
IJALR 1(3): 62-90 (2010) |
| 2009 |
| 13 |  | Ping-Feng Pai,
Shun-Lin Yang,
Ping-Teng Chang:
Forecasting output of integrated circuit industry by support vector regression models with marriage honey-bees optimization algorithms.
Expert Syst. Appl. 36(7): 10746-10751 (2009) |
| 12 |  | Ping-Teng Chang,
Kuo-Ping Lin,
Chih-Sheng Lin,
Kuo-Chen Hung,
Lung-Ting Hung,
Ban-Dar Hsu:
Developing a Fuzzy Bicluster Regression to Estimate Heat Tolerance in Plants by Chlorophyll Fluorescence.
IEEE T. Fuzzy Systems 17(3): 485-504 (2009) |
| 11 |  | Ping-Teng Chang,
Jung-Hua Lee,
Kuo-Chen Hung,
Jeng-Teng Tsai,
Chyung Perng:
Applying fuzzy weighted average approach to evaluate office layouts with Feng-Shui consideration.
Mathematical and Computer Modelling 50(9-10): 1514-1537 (2009) |
| 2007 |
| 10 |  | Ping-Feng Pai,
Kuo-Ping Lin,
Ping-Teng Chang:
Potential Assessment of an Ellipsoidal Neural Fuzzy Time Series Model for Freeway Traffic Prediction.
ICANNGA (1) 2007: 631-639 |
| 2006 |
| 9 |  | Ping-Teng Chang,
Kuo-Chen Hung:
/spl alpha/-cut fuzzy arithmetic: simplifying rules and a fuzzy function optimization with a decision variable.
IEEE T. Fuzzy Systems 14(4): 496-510 (2006) |
| 8 |  | Ping-Teng Chang,
Ping-Feng Pai,
Kuo-Ping Lin,
Ming-Shiu Wu:
Applying fuzzy arithmetic to the system dynamics for the customer-producer-employment model.
Int. J. Systems Science 37(10): 673-698 (2006) |
| 7 |  | Ping-Teng Chang,
Ching-Hsiang Chang:
An elaborative unit cost structure-based fuzzy economic production quantity model.
Mathematical and Computer Modelling 43(11-12): 1337-1356 (2006) |
| 2005 |
| 6 |  | Wei-Chiang Hong,
Ping-Feng Pai,
Chen-Tung Chen,
Ping-Teng Chang:
Recurrent Support Vector Machines in Reliability Prediction.
ICNC (1) 2005: 619-629 |
| 5 |  | Ping-Teng Chang:
Fuzzy strategic replacement analysis.
European Journal of Operational Research 160(2): 532-559 (2005) |
| 2002 |
| 4 |  | Ping-Teng Chang:
Fuzzy stage characteristic-preserving product life cycle modeling.
Fuzzy Sets and Systems 126(1): 33-47 (2002) |
| 2001 |
| 3 |  | Ping-Teng Chang,
Yu-Ting Lo:
Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach.
Int. J. Computer Integrated Manufacturing 14(4): 367-384 (2001) |
| 2000 |
| 2 |  | Ping-Teng Chang,
Chia-Hua Chang:
An integrated artificial intelligent computer-aided process planning system.
Int. J. Computer Integrated Manufacturing 13(6): 483-497 (2000) |
| 1994 |
| 1 |  | David Ben-Arieh,
Ping-Teng Chang:
An extension to the p-median group technology algorithm.
Computers & OR 21(2): 119-125 (1994) |