![]() | ![]() |
| 2011 | ||
|---|---|---|
| 3 | Yuan-Shyi Peter Chiu, Hong-Dar Lin, Huei-Hsin Chang: Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown. Computers & Industrial Engineering 60(4): 576-584 (2011) | |
| 2 | Yuan-Shyi Peter Chiu, Shang-Chih Liu, Chun-Lin Chiu, Huei-Hsin Chang: Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments. Mathematical and Computer Modelling 54(9-10): 2165-2174 (2011) | |
| 2010 | ||
| 1 | Yuan-Shyi Peter Chiu, Feng-Tsung Cheng, Huei-Hsin Chang: Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework. Appl. Math. Lett. 23(10): 1152-1155 (2010) | |
| 1 | Feng-Tsung Cheng | [1] |
| 2 | Chun-Lin Chiu | [2] |
| 3 | Yuan-Shyi Peter Chiu | [1] [2] [3] |
| 4 | Hong-Dar Lin | [3] |
| 5 | Shang-Chih Liu | [2] |
Data released under the ODC-BY 1.0 license — See also our legal information page