 | 2011 |
| 26 |  | Xiang Li,
Yongjian Li,
Xiaoqiang Cai:
On a multi-period supply chain system with supplementary order opportunity.
European Journal of Operational Research 209(3): 273-284 (2011) |
| 25 |  | Zeshui Xu,
Xiaoqiang Cai,
Shousheng Liu:
Nonlinear Programming Model Integrating Different Preference Structures.
IEEE Transactions on Systems, Man, and Cybernetics, Part A 41(1): 169-177 (2011) |
| 24 |  | Zeshui Xu,
Xiaoqiang Cai:
Group consensus algorithms based on preference relations.
Inf. Sci. 181(1): 150-162 (2011) |
| 23 |  | Zeshui Xu,
Xiaoqiang Cai,
Eulalia Szmidt:
Algorithms for estimating missing elements of incomplete intuitionistic preference relations.
Int. J. Intell. Syst. 26(9): 787-813 (2011) |
| 22 |  | Xiaoqiang Cai,
Xianyi Wu,
Xian Zhou:
Scheduling deteriorating jobs on a single machine subject to breakdowns.
J. Scheduling 14(2): 173-186 (2011) |
| 2010 |
| 21 |  | Yongjian Li,
Jian Chen,
Xiaoqiang Cai,
Fengsheng Tu:
Optimal manpower Planning Decision with Single Employee Type Considering Minimal Employment Period Constraint.
APJOR 27(3): 411-436 (2010) |
| 20 |  | Yongjian Li,
Ji-Hong Zhang,
Jian Chen,
Xiaoqiang Cai:
Optimal Solution Structure for Multi-Period Production Planning with Returned Products remanufacturing.
APJOR 27(5): 629-648 (2010) |
| 19 |  | Zeshui Xu,
Xiaoqiang Cai:
Recent advances in intuitionistic fuzzy information aggregation.
FO & DM 9(4): 359-381 (2010) |
| 18 |  | Zeshui Xu,
Xiaoqiang Cai:
Nonlinear optimization models for multiple attribute group decision making with intuitionistic fuzzy information.
Int. J. Intell. Syst. 25(6): 489-513 (2010) |
| 2009 |
| 17 |  | Xiaoqiang Cai,
Xianyi Wu,
Xian Zhou:
Stochastic scheduling on parallel machines to minimize discounted holding costs.
J. Scheduling 12(4): 375-388 (2009) |
| 16 |  | Xiaoqiang Cai,
Xianyi Wu,
Xian Zhou:
Stochastic Scheduling Subject to Preemptive-Repeat Breakdowns with Incomplete Information.
Operations Research 57(5): 1236-1249 (2009) |
| 2007 |
| 15 |  | Xiaobing Gan,
Yanhong Gu,
George L. Vairaktarakis,
Xiaoqiang Cai,
Quanle Chen:
A Scheduling Problem with One Producer and the Bargaining Counterpart with Two Producers.
ESCAPE 2007: 305-316 |
| 14 |  | Xiaolin Xu,
Xiaoqiang Cai,
Chunlin Liu,
Chikit To:
Optimal Commodity Distribution for a Vehicle with Fixed Capacity Under Vendor Managed Inventory.
ESCAPE 2007: 329-339 |
| 13 |  | Yongjian Li,
Jian Chen,
Xiaoqiang Cai:
An integrated staff-sizing approach considering feasibility of scheduling decision.
Annals OR 155(1): 361-390 (2007) |
| 12 |  | Xiaoqiang Cai,
Xianyi Wu,
Xian Zhou:
Single-machine scheduling with general costs under compound-type distributions.
J. Scheduling 10(1): 77-84 (2007) |
| 2006 |
| 11 |  | Quanle Chen,
Xiaoqiang Cai,
Yanhong Gu:
An Optimization Problem on Two-Partition of Jobs for Profit Allocation.
APCCAS 2006: 626-629 |
| 10 |  | Xiaoqiang Cai,
Yongjian Li,
Fengsheng Tu:
Maximizing Dual Function by Genetic Algorithm - A New Approach for Optimal Manpower Planning.
ICIC (2) 2006: 1147-1157 |
| 2005 |
| 9 |  | Yongjian Li,
Jian Chen,
Xiaoqiang Cai,
Fengsheng Tu:
Optimal Manpower Planning with Temporal Labor and Contract Period Constraints.
AAIM 2005: 350-359 |
| 8 |  | Kok Lay Teo,
T. C. Edwin Cheng,
Xiaoqiang Cai,
Xiaoqi Yang:
Preface.
Annals OR 133(1-4): 17-20 (2005) |
| 7 |  | Xiaoqiang Cai,
Xianyi Wu,
Xian Zhou:
Dynamically optimal policies for stochastic scheduling subject to preemptive-repeat machine breakdowns.
IEEE T. Automation Science and Engineering 2(2): 158-172 (2005) |
| 2004 |
| 6 |  | Xiaoqiang Cai,
Xiaolin Xu,
Xian Zhou:
Optimal production decisions under an uncertain deadline.
SMC (7) 2004: 6009-6014 |
| 5 |  | Yongjian Li,
Xiaoqiang Cai,
Fengsheng Tu,
Xiuli Shao:
Optimization of tandem queue systems with finite buffers.
Computers & OR 31(6): 963-984 (2004) |
| 2002 |
| 4 |  | George L. Vairaktarakis,
Xiaoqiang Cai,
Chung-Yee Lee:
Workforce planning in synchronous production systems.
European Journal of Operational Research 136(3): 551-572 (2002) |
| 2000 |
| 3 |  | Xiaoqiang Cai,
Chung-Yee Lee,
Tin-Lam Wong:
Multiprocessor task scheduling to minimize the maximum tardiness and the total completion time.
IEEE Transactions on Robotics 16(6): 824-830 (2000) |
| 2 |  | Guochuan Zhang,
Xiaoqiang Cai,
C. K. Wong:
Linear time-approximation algorithms for bin packing.
Oper. Res. Lett. 26(5): 217-222 (2000) |
| 1998 |
| 1 |  | Xiaoqiang Cai,
T. C. Edwin Cheng:
Multi-machine Scheduling with Variance Minimization.
Discrete Applied Mathematics 84(1-3): 55-70 (1998) |