 | 2012 |
| 11 |  | Leopoldo Eduardo Cárdenas-Barrón,
Gerardo Treviño-Garza,
Hui-Ming Wee:
A simple and better algorithm to solve the vendor managed inventory control system of multi-product multi-constraint economic order quantity model.
Expert Syst. Appl. 39(3): 3888-3895 (2012) |
| 10 |  | Kun-Jen Chung,
Leopoldo Eduardo Cárdenas-Barrón:
The complete solution procedure for the EOQ and EPQ inventory models with linear and fixed backorder costs.
Mathematical and Computer Modelling 55(11-12): 2151-2156 (2012) |
| 2011 |
| 9 |  | Jinn-Tsair Teng,
Leopoldo Eduardo Cárdenas-Barrón,
Kuo-Ren Lou:
The economic lot size of the integrated vendor-buyer inventory system derived without derivatives: A simple derivation.
Applied Mathematics and Computation 217(12): 5972-5977 (2011) |
| 8 |  | Leopoldo Eduardo Cárdenas-Barrón,
Hui-Ming Wee,
Mauricio F. Blos:
Solving the vendor-buyer integrated inventory system with arithmetic-geometric inequality.
Mathematical and Computer Modelling 53(5-6): 991-997 (2011) |
| 7 |  | Leopoldo Eduardo Cárdenas-Barrón,
Hui-Ming Wee,
Jinn-Tsair Teng:
A supplement to "Using the EPQ for coordinated planning of a product with partial backordering and its components".
Mathematical and Computer Modelling 54(1-2): 852-857 (2011) |
| 6 |  | Gede Agus Widyadana,
Leopoldo Eduardo Cárdenas-Barrón,
Hui-Ming Wee:
Economic order quantity model for deteriorating items with planned backorder level.
Mathematical and Computer Modelling 54(5-6): 1569-1575 (2011) |
| 2010 |
| 5 |  | Juan García-Laguna,
Luis A. San-José,
Leopoldo Eduardo Cárdenas-Barrón,
Joaquin Sicilia:
The integrality of the lot size in the basic EOQ and EPQ models: Applications to other production-inventory models.
Applied Mathematics and Computation 216(5): 1660-1672 (2010) |
| 4 |  | Leopoldo Eduardo Cárdenas-Barrón:
An easy method to derive EOQ and EPQ inventory models with backorders.
Computers & Mathematics with Applications 59(2): 948-952 (2010) |
| 2009 |
| 3 |  | Leopoldo Eduardo Cárdenas-Barrón:
Economic production quantity with rework process at a single-stage manufacturing system with planned backorders.
Computers & Industrial Engineering 57(3): 1105-1113 (2009) |
| 2 |  | Leopoldo Eduardo Cárdenas-Barrón:
On optimal batch sizing in a multi-stage production system with rework consideration.
European Journal of Operational Research 196(3): 1238-1244 (2009) |
| 1 |  | Mauricio F. Blos,
Hui-Ming Wee,
Leopoldo Eduardo Cárdenas-Barrón:
The threat of outsourcing US ports operation to any terrorist country supporter: a case study using fault tree analysis.
IJIDS 1(4): 411-427 (2009) |