 | 2012 |
| 30 |  | Wojciech Bozejko,
Mariusz Uchronski,
Mieczyslaw Wodecki:
Fast Parallel Cost Function Calculation for the Flow Shop Scheduling Problem.
ICAISC (2) 2012: 378-386 |
| 29 |  | Wojciech Bozejko,
Mariusz Uchronski,
Mieczyslaw Wodecki:
Solving the Flexible Job Shop Problem on GPU.
ICAISC (2) 2012: 387-394 |
| 28 |  | Wojciech Bozejko:
On single-walk parallelization of the job shop problem solving algorithms.
Computers & OR 39(9): 2258-2264 (2012) |
| 2011 |
| 27 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
Single-walk Parallelization of the Genetic Algorithm.
ICAART (1) 2011: 586-590 |
| 26 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
The Methodology of Parallel Memetic Algorithms Designing.
ICAART (1) 2011: 643-648 |
| 25 |  | Wojciech Bozejko,
Mariusz Uchronski,
Mieczyslaw Wodecki:
Parallel estimation of the cost function for the flexible scheduling problemI.
Procedia CS 4: 2236-2245 (2011) |
| 2010 |
| 24 |  | Wojciech Bozejko,
Michal Czapinski,
Mieczyslaw Wodecki:
Parallel Hybrid Metaheuristics for the Scheduling with Fuzzy Processing Times.
ICAISC (2) 2010: 379-386 |
| 23 |  | Wojciech Bozejko,
Mariusz Uchronski:
A Neuro-tabu Search Algorithm for the Job Shop Problem.
ICAISC (2) 2010: 387-394 |
| 22 |  | Wojciech Bozejko,
Mariusz Uchronski,
Mieczyslaw Wodecki:
Parallel Meta2heuristics for the Flexible Job Shop Problem.
ICAISC (2) 2010: 395-402 |
| 21 |  | Wojciech Bozejko,
Mariusz Uchronski,
Mieczyslaw Wodecki:
Parallel hybrid metaheuristics for the flexible job shop problem.
Computers & Industrial Engineering 59(2): 323-333 (2010) |
| 20 |  | Wojciech Bozejko,
Mariusz Uchronski,
Mieczyslaw Wodecki:
The new golf neighborhood for the exible job shop problem.
Procedia CS 1(1): 289-296 (2010) |
| 2009 |
| 19 |  | Wojciech Bozejko,
Czeslaw Smutnicki,
Mariusz Uchronski:
Parallel Calculating of the Goal Function in Metaheuristics Using GPU.
ICCS (1) 2009: 1014-1023 |
| 18 |  | Wojciech Bozejko,
Jaroslaw Pempera,
Czeslaw Smutnicki:
Parallel Simulated Annealing for the Job Shop Scheduling Problem.
ICCS (1) 2009: 631-640 |
| 17 |  | Wojciech Bozejko,
Mariusz Makuchowski:
A fast hybrid tabu search algorithm for the no-wait job shop problem.
Computers & Industrial Engineering 56(4): 1502-1509 (2009) |
| 16 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
Solving permutational routing problems by population-based metaheuristics.
Computers & Industrial Engineering 57(1): 269-276 (2009) |
| 15 |  | Wojciech Bozejko:
Solving the flow shop problem by parallel programming.
J. Parallel Distrib. Comput. 69(5): 470-481 (2009) |
| 2008 |
| 14 |  | Wojciech Bozejko,
Jaroslaw Pempera,
Adam Smutnicki:
Parallel Single-Thread Strategies in Scheduling.
ICAISC 2008: 995-1006 |
| 13 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
Parallel Path-Relinking Method for the Flow Shop Scheduling Problem.
ICCS (1) 2008: 264-273 |
| 2007 |
| 12 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
Parallel Scatter Search Algorithm for the Flow Shop Sequencing Problem.
PPAM 2007: 180-188 |
| 11 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
On the theoretical properties of swap multimoves.
Oper. Res. Lett. 35(2): 227-231 (2007) |
| 2006 |
| 10 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
A New Inter-island Genetic Operator for Optimization Problems with Block Properties.
ICAISC 2006: 334-343 |
| 9 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
A Fast Parallel Dynasearch Algorithm for Some Scheduling Problems.
PARELEC 2006: 275-280 |
| 2005 |
| 8 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
Task Realization's Optimization with Earliness and Tardiness Penalties in Distributed Computation Systems.
AWIC 2005: 69-75 |
| 7 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
A Hybrid Evolutionary Algorithm for some Discrete Optimization Problems.
ISDA 2005: 326-331 |
| 2004 |
| 6 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
Parallel Genetic Algorithm for Minimizing Total Weighted Completion Time.
ICAISC 2004: 400-405 |
| 5 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
The New Concepts in Parallel Simulated Annealing Method.
ICAISC 2004: 853-859 |
| 4 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
Parallel Tabu Search Method Approach for Very Difficult Permutation Scheduling Problems.
PARELEC 2004: 156-161 |
| 2003 |
| 3 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
Parallel Genetic Algorithm for the Flow Shop Scheduling Problem.
PPAM 2003: 566-571 |
| 2002 |
| 2 |  | Wojciech Bozejko,
Mieczyslaw Wodecki:
Solving the Flow Shop Problem by Parallel Tabu Search.
PARELEC 2002: 189-194 |
| 2001 |
| 1 |  | Mieczyslaw Wodecki,
Wojciech Bozejko:
Solving the Flow Shop Problem by Parallel Simulated Annealing.
PPAM 2001: 236-246 |