 | 2012 |
| 21 |  | Nils Boysen,
Armin Scholl,
Nico Wopperer:
Resequencing of mixed-model assembly lines: Survey and research agenda.
European Journal of Operational Research 216(3): 594-604 (2012) |
| 20 |  | Simon Emde,
Nils Boysen:
Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines.
European Journal of Operational Research 217(2): 287-299 (2012) |
| 19 |  | Nils Boysen,
Malte Fliedner,
Florian Jaehn,
Erwin Pesch:
Shunting yard operations: Theoretical aspects and applications.
European Journal of Operational Research 220(1): 1-14 (2012) |
| 2011 |
| 18 |  | Nils Boysen,
Malte Fliedner:
Scheduling aircraft landings to balance workload of ground staff.
Computers & Industrial Engineering 60(2): 206-217 (2011) |
| 17 |  | Nils Boysen,
Stefan Bock:
Scheduling just-in-time part supply for mixed-model assembly lines.
European Journal of Operational Research 211(1): 15-25 (2011) |
| 16 |  | Malte Fliedner,
Nils Boysen,
Armin Scholl:
On the part inventory model sequencing problem: complexity and Beam Search heuristic.
J. Scheduling 14(1): 17-25 (2011) |
| 15 |  | Nils Boysen,
Florian Jaehn,
Erwin Pesch:
Scheduling Freight Trains in Rail-Rail Transshipment Yards.
Transportation Science 45(2): 199-211 (2011) |
| 2010 |
| 14 |  | Nils Boysen:
Truck scheduling at zero-inventory cross docking terminals.
Computers & OR 37(1): 32-41 (2010) |
| 13 |  | Malte Fliedner,
Nils Boysen,
Armin Scholl:
Solving symmetric mixed-model multi-level just-in-time scheduling problems.
Discrete Applied Mathematics 158(3): 222-231 (2010) |
| 12 |  | Armin Scholl,
Malte Fliedner,
Nils Boysen:
Absalom: Balancing assembly lines with assignment restrictions.
European Journal of Operational Research 200(3): 688-701 (2010) |
| 11 |  | Nils Boysen,
Malte Fliedner:
Determining crane areas in intermodal transshipment yards: The yard partition problem.
European Journal of Operational Research 204(2): 336-342 (2010) |
| 10 |  | Uli Golle,
Nils Boysen,
Franz Rothlauf:
Analysis and design of sequencing rules for car sequencing.
European Journal of Operational Research 206(3): 579-585 (2010) |
| 2009 |
| 9 |  | Armin Scholl,
Nils Boysen,
Malte Fliedner:
Optimally solving the alternative subgraphs assembly line balancing problem.
Annals OR 172(1): 243-258 (2009) |
| 8 |  | Nils Boysen,
Malte Fliedner,
Armin Scholl:
Sequencing mixed-model assembly lines: Survey, classification and model critique.
European Journal of Operational Research 192(2): 349-373 (2009) |
| 7 |  | Nils Boysen,
Malte Fliedner,
Armin Scholl:
The product rate variation problem and its relevance in real world mixed-model assembly lines.
European Journal of Operational Research 197(2): 818-824 (2009) |
| 2008 |
| 6 |  | Nils Boysen,
Malte Fliedner:
A versatile algorithm for assembly line balancing.
European Journal of Operational Research 184(1): 39-56 (2008) |
| 5 |  | Malte Fliedner,
Nils Boysen:
Solving the car sequencing problem via Branch & Bound.
European Journal of Operational Research 191(3): 1023-1042 (2008) |
| 2007 |
| 4 |  | Nils Boysen,
Malte Fliedner:
Comments on "Solving real car sequencing problems with ant colony optimization".
European Journal of Operational Research 182(1): 466-468 (2007) |
| 3 |  | Nils Boysen,
Malte Fliedner,
Armin Scholl:
A classification of assembly line balancing problems.
European Journal of Operational Research 183(2): 674-693 (2007) |
| 2006 |
| 2 |  | Nils Boysen:
Produktionsplanung bei Variantenfließfertigung.
OR 2006: 11-15 |
| 2005 |
| 1 |  | Nils Boysen,
Christian Ringle:
Optionsbündelung und Fertigungsablauf in der Automobilindustrie.
OR 2005: 149-154 |