 | 2011 |
| 22 |  | Marko Bertogna,
Sanjoy K. Baruah:
Tests for global EDF schedulability analysis.
Journal of Systems Architecture - Embedded Systems Design 57(5): 487-497 (2011) |
| 21 |  | Gang Yao,
Giorgio C. Buttazzo,
Marko Bertogna:
Feasibility analysis under fixed priority scheduling with limited preemptions.
Real-Time Systems 47(3): 198-223 (2011) |
| 2010 |
| 20 |  | Marko Bertogna,
Giorgio C. Buttazzo,
Mauro Marinoni,
Gang Yao,
Francesco Esposito,
Marco Caccamo:
Preemption Points Placement for Sporadic Task Sets.
ECRTS 2010: 251-260 |
| 19 |  | Gang Yao,
Giorgio C. Buttazzo,
Marko Bertogna:
Comparative evaluation of limited preemptive methods.
ETFA 2010: 1-8 |
| 18 |  | Gang Yao,
Giorgio C. Buttazzo,
Marko Bertogna:
Feasibility Analysis under Fixed Priority Scheduling with Fixed Preemption Points.
RTCSA 2010: 71-80 |
| 17 |  | Dario Faggioli,
Marko Bertogna,
Fabio Checconi:
Sporadic Server revisited.
SAC 2010: 340-345 |
| 16 |  | Marko Bertogna,
Sanjoy K. Baruah:
Limited preemption EDF scheduling of sporadic task systems.
IEEE Trans. Industrial Informatics 6(4): 579-591 (2010) |
| 2009 |
| 15 |  | Yifan Wu,
Marko Bertogna:
Improving Task Responsiveness with Limited Preemptions.
ETFA 2009: 1-8 |
| 14 |  | Marko Bertogna:
Evaluation of Existing Schedulability Tests for Global EDF.
ICPP Workshops 2009: 11-18 |
| 13 |  | Enrico Bini,
Marko Bertogna,
Sanjoy K. Baruah:
Virtual Multiprocessor Platforms: Specification and Use.
IEEE Real-Time Systems Symposium 2009: 437-446 |
| 12 |  | Enrico Bini,
Giorgio C. Buttazzo,
Marko Bertogna:
The Multi Supply Function Abstraction for Multiprocessors.
RTCSA 2009: 294-302 |
| 11 |  | Gang Yao,
Giorgio C. Buttazzo,
Marko Bertogna:
Bounding the Maximum Length of Non-preemptive Regions under Fixed Priority Scheduling.
RTCSA 2009: 351-360 |
| 10 |  | Marko Bertogna,
Nathan Fisher,
Sanjoy K. Baruah:
Resource-sharing servers for Open Environments.
IEEE Trans. Industrial Informatics 5(3): 202-219 (2009) |
| 9 |  | Marko Bertogna,
Michele Cirinei,
Giuseppe Lipari:
Schedulability Analysis of Global Scheduling Algorithms on Multiprocessor Platforms.
IEEE Trans. Parallel Distrib. Syst. 20(4): 553-566 (2009) |
| 8 |  | Marko Bertogna,
Nathan Fisher,
Sanjoy K. Baruah:
Resource holding times: computation and optimization.
Real-Time Systems 41(2): 87-117 (2009) |
| 2008 |
| 7 |  | Theodore P. Baker,
Michele Cirinei,
Marko Bertogna:
EDZL scheduling analysis.
Real-Time Systems 40(3): 264-289 (2008) |
| 2007 |
| 6 |  | Nathan Fisher,
Marko Bertogna,
Sanjoy K. Baruah:
Resource-Locking Durations in EDF-Scheduled Systems.
IEEE Real-Time and Embedded Technology and Applications Symposium 2007: 91-100 |
| 5 |  | Marko Bertogna,
Nathan Fisher,
Sanjoy K. Baruah:
Static-Priority Scheduling and Resource Hold Times.
IPDPS 2007: 1-8 |
| 4 |  | Marko Bertogna,
Michele Cirinei:
Response-Time Analysis for Globally Scheduled Symmetric Multiprocessor Platforms.
RTSS 2007: 149-160 |
| 3 |  | Nathan Fisher,
Marko Bertogna,
Sanjoy K. Baruah:
The Design of an EDF-Scheduled Resource-Sharing Open Environment.
RTSS 2007: 83-92 |
| 2005 |
| 2 |  | Marko Bertogna,
Michele Cirinei,
Giuseppe Lipari:
Improved Schedulability Analysis of EDF on Multiprocessor Platforms.
ECRTS 2005: 209-218 |
| 1 |  | Marko Bertogna,
Michele Cirinei,
Giuseppe Lipari:
New Schedulability Tests for Real-Time Task Sets Scheduled by Deadline Monotonic on Multiprocessors.
OPODIS 2005: 306-321 |