 | 2012 |
| 40 |  | Yuan Qu,
Jonathan F. Bard:
A GRASP with adaptive large neighborhood search for pickup and delivery problems with transshipment.
Computers & OR 39(10): 2439-2456 (2012) |
| 2011 |
| 39 |  | Yumin Deng,
Jonathan F. Bard:
A reactive GRASP with path relinking for capacitated clustering.
J. Heuristics 17(2): 119-152 (2011) |
| 38 |  | Ahmad I. Jarrah,
Jonathan F. Bard:
Pickup and delivery network segmentation using contiguous geographic clustering.
JORS 62(10): 1827-1843 (2011) |
| 2010 |
| 37 |  | Jonathan F. Bard,
Narameth Nananukul:
A branch-and-price algorithm for an integrated production and inventory routing problem.
Computers & OR 37(12): 2202-2217 (2010) |
| 36 |  | Jonathan F. Bard,
Ahmad I. Jarrah,
Jing Zan:
Validating vehicle routing zone construction using Monte Carlo simulation.
European Journal of Operational Research 206(1): 73-85 (2010) |
| 2009 |
| 35 |  | Jonathan F. Bard:
Bilevel Linear Programming.
Encyclopedia of Optimization 2009: 221-224 |
| 34 |  | Jonathan F. Bard:
Bilevel Linear Programming: Complexity, Equivalence to Minmax, Concave Programs.
Encyclopedia of Optimization 2009: 225-228 |
| 33 |  | Jonathan F. Bard:
Bilevel Programming in Management.
Encyclopedia of Optimization 2009: 269-274 |
| 32 |  | Jonathan F. Bard,
Narameth Nananukul:
Heuristics for a multiperiod inventory routing problem with production decisions.
Computers & Industrial Engineering 57(3): 713-723 (2009) |
| 31 |  | Jonathan F. Bard,
Narameth Nananukul:
The integrated production-inventory-distribution-routing problem.
J. Scheduling 12(3): 257-280 (2009) |
| 2008 |
| 30 |  | Susan K. Monkman,
Douglas J. Morrice,
Jonathan F. Bard:
A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs.
European Journal of Operational Research 187(3): 1100-1114 (2008) |
| 29 |  | Jonathan F. Bard,
Lin Wan:
Workforce Design with Movement Restrictions Between Workstation Groups.
Manufacturing & Service Operations Management 10(1): 24-42 (2008) |
| 2007 |
| 28 |  | Jonathan F. Bard,
David P. Morton,
Yong Min Wang:
Workforce planning at USPS mail processing and distribution centers using stochastic optimization.
Annals OR 155(1): 51-78 (2007) |
| 27 |  | Jonathan F. Bard,
Hadi W. Purnomo:
Cyclic preference scheduling of nurses using a Lagrangian-based heuristic.
J. Scheduling 10(1): 5-23 (2007) |
| 26 |  | Guidong Zhu,
Jonathan F. Bard,
Gang Yu:
A two-stage stochastic programming approach for project planning with uncertain activity durations.
J. Scheduling 10(3): 167-180 (2007) |
| 2006 |
| 25 |  | Xinhui Zhang,
Jonathan F. Bard:
Comparative approaches to equipment scheduling in high volume factories.
Computers & OR 33: 132-157 (2006) |
| 24 |  | Xiangtong Qi,
Jonathan F. Bard:
Generating labor requirements and rosters for mail handlers using simulation and optimization.
Computers & OR 33: 2645-2666 (2006) |
| 23 |  | Xinhui Zhang,
Jonathan F. Bard:
A multi-period machine assignment problem.
European Journal of Operational Research 170(2): 398-415 (2006) |
| 22 |  | Guidong Zhu,
Jonathan F. Bard,
Gang Yu:
A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem.
INFORMS Journal on Computing 18(3): 377-390 (2006) |
| 21 |  | Jonathan F. Bard,
Lin Wan:
The task assignment problem for unrestricted movement between workstation groups.
J. Scheduling 9(4): 315-341 (2006) |
| 2005 |
| 20 |  | Jonathan F. Bard,
Hadi W. Purnomo:
Preference scheduling for nurses using column generation.
European Journal of Operational Research 164(2): 510-534 (2005) |
| 2004 |
| 19 |  | Xiangtong Qi,
Jonathan F. Bard,
Gang Yu:
Class Scheduling for Pilot Training.
Operations Research 52(1): 148-162 (2004) |
| 2003 |
| 18 |  | Jonathan F. Bard,
Canan Binici,
Anura H. deSilva:
Staff scheduling at the United States Postal Service.
Computers & OR 30(5): 745-771 (2003) |
| 17 |  | Roger Z. Ríos-Mercado,
Jonathan F. Bard:
The Flow Shop Scheduling Polyhedron with Setup Time.
J. Comb. Optim. 7(3): 291-318 (2003) |
| 16 |  | Benjamin G. Thengvall,
Jonathan F. Bard,
Gang Yu:
A Bundle Algorithm Approach for the Aircraft Schedule Recovery Problem During Hub Closures.
Transportation Science 37(4): 392-407 (2003) |
| 2002 |
| 15 |  | Xiangtong Qi,
Gang Yu,
Jonathan F. Bard:
Single machine scheduling with assignable due dates.
Discrete Applied Mathematics 122(1-3): 211-233 (2002) |
| 14 |  | Jonathan F. Bard,
George Kontoravdis,
Gang Yu:
A Branch-and-Cut Procedure for the Vehicle Routing Problem with Time Windows.
Transportation Science 36(2): 250-269 (2002) |
| 13 |  | Patrick Jaillet,
Jonathan F. Bard,
Liu Huang,
Moshe Dror:
Delivery Cost Approximations for Inventory Routing Problems in a Rolling Horizon Framework.
Transportation Science 36(3): 292-300 (2002) |
| 2000 |
| 12 |  | Jonathan F. Bard,
John Plummer,
Jean Claude Sourie:
A bilevel programming approach to determining tax credits for biofuel production.
European Journal of Operational Research 120(1): 30-46 (2000) |
| 1999 |
| 11 |  | Roger Z. Ríos-Mercado,
Jonathan F. Bard:
An Enhanced TSP-Based Heuristic for Makespan Minimization in a Flow Shop with Setup Times.
J. Heuristics 5(1): 53-70 (1999) |
| 1998 |
| 10 |  | Roger Z. Ríos-Mercado,
Jonathan F. Bard:
Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups.
Computers & OR 25(5): 351-366 (1998) |
| 9 |  | Jonathan F. Bard,
Liu Huang,
Patrick Jaillet,
Moshe Dror:
A Decomposition Approach to the Inventory Routing Problem with Satellite Facilities.
Transportation Science 32(2): 189-203 (1998) |
| 1997 |
| 8 |  | Michael F. Argüello,
Jonathan F. Bard,
Gang Yu:
A Grasp for Aircraft Routing in Response to Groundings and Delays.
J. Comb. Optim. 1(3): 211-228 (1997) |
| 1995 |
| 7 |  | George Kontoravdis,
Jonathan F. Bard:
A GRASP for the Vehicle Routing Problem with Time Windows.
INFORMS Journal on Computing 7(1): 10-23 (1995) |
| 1992 |
| 6 |  | Samuel B. Graves,
Jeffrey L. Ringuest,
Jonathan F. Bard:
Recent developments in screening methods for nondominated solutions in multiobjective optimization.
Computers & OR 19(7): 683-694 (1992) |
| 1991 |
| 5 |  | Thomas A. Feo,
Krishnamurthi Venkatraman,
Jonathan F. Bard:
A GRASPTM for a difficult single machine scheduling problem, .
Computers & OR 18(8): 635-643 (1991) |
| 1989 |
| 4 |  | Jonathan F. Bard,
Jeanne L. Miller:
Probabilistic shortest path problems with budgetary constraints.
Computers & OR 16(2): 145-159 (1989) |
| 1985 |
| 3 |  | Jonathan F. Bard,
Sangit Chatterjee:
Objective function bounds for the inexact linear programming problem with generalized cost coefficients.
Computers & OR 12(5): 483-491 (1985) |
| 1982 |
| 2 |  | Jonathan F. Bard,
James E. Falk:
An explicit solution to the multi-level programming problem.
Computers & OR 9(1): 77-100 (1982) |
| 1 |  | Jonathan F. Bard,
James E. Falk:
A separable programming approach to the linear complementarity problem.
Computers & OR 9(2): 153-159 (1982) |